BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 8, 2026 at 8:00 PM

Updated May 15, 2026

Renovation of a military facility in Port Hadlock, Washington. Completed plans call for the renovation of a military facility.

The work consists of replacement of an on-site sewage (OSS) system at the Amanda Gordon facility. Construction activities include furnishing all labor, materials, equipment, and incidentals necessary to remove and replace the existing OSS system in accordance with project requirements and applicable codes and standards. Work shall be completed within 30 calendar days from issuance of the Notice to Proceed. Disclosure of the Magnitude of Construction Projects, the anticipated project magnitude is between $25,000.00 and $100,000.00. The contractor shall begin performance within 10 calendar days and complete it within 30 calendar days. Questions regarding the solicitation and project must be submitted in writing to Robert S. Miller, Contracting Officer, via e-mail at Robert.Miller2@ihs.gov. Questions will be accepted up to 7 days before quote due date. The Government may not answer any questions submitted after this date. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

GC Bidding

Military

$100,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 21, 2026

June 22, 2026

Project location map

111 Cedar Ave, Port Hadlock, WA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.