Published May 5, 2026 at 8:00 PM

Updated May 16, 2026

Site work, new construction and renovation of a civil project in Webster, Massachusetts. Completed plans call for site work for a water / sewer project; for the construction of a water / sewer project; and for the renovation of a water / sewer project.

The work consists of rehabilitation of the Narrows Pump Station including: selective demolition of the interior piping, pumping equipment, miscellaneous metals, and electrical utility service, distribution equipment, and ancillary devices in the station, installation of new 200A electric service, meter, main circuit breaker, automatic transfer switch (ATS), panelboard, lighting, receptacles, grounding system, sump pump, packaged duplex pumping system, pump control panel, and associated instruments, valves, piping and supports, pump station bypass structure, temporary sewer bypass system, access ladder, handrails, metal platform, and modifications to existing equipment and circuitry to remain at the pump station. Contractor Qualification DCAMM Certificate Question Deadline 04/30/2026 All questions about the meaning or intent of the Bidding Documents shall be submitted in writing to the Engineer via the Tighe & Bond website The Work includes the following major items: a. Retention and reuse of the existing NPS building, foundation, and below grade structure. b. Removal of existing spiral staircase and handrails. c. Retention and reuse of the existing generators and its associated equipment, piping, and controls. d. Retention and reuse of ventilation equipment, electrical service entrance, and controls not directly associated with the ejector equipment including the panelboard, electrical meter, and main disconnect. e. Replacement of the ejector equipment including all associated piping, valves, level controls, and related equipment with the proposed Overwatch Direct In-Line Pump System. This includes replacement of suction, discharge, control panels, and interior piping. f. Installation of new platform steel, handrails, and ladder. g. Installation of a new pump station bypass structure. h. New electrical controls and connections associated with the new Direct In-Line pump system. The new panel will be located within the existing building. i. Modification of existing SCADA system by the Town's System Integrator, Woodard and Curran, to support the Narrows Pump Station equipment upgrades. Addendum #1 has been issued as of 4-15-2026 and includes a bid date extension for the filed subbids. Addendum #2 has been issued as of 4-23-2026. Addendum #3 has been issued as of 4-30-2026.

Post-Bid

Water / Sewer

$930,000.00

Public - City

New Construction, Renovation, Site Work

20

16

6

6

Subscribe For Documents

41 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
969
Active Projects
527
Bidding Soon
4,028
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 5, 2026

June 4, 2026

Project location map

80 Birch Island Rd, Webster, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.