BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 24, 2026 at 8:00 PM

Updated May 16, 2026

Site work for a water / sewer project in Flagler Beach, Florida. Completed plans call for site work for a water / sewer project.

56:2027 Question Deadline 04/27/2026 at 5:00 PM ET All questions about the meaning or intent of the Bidding Documents are to be submitted to the City Clerks office in writing (via email), Penny Overstreet poverstreet@cityofflaglerbeach.com. Construction of approximately 2,800 LF of new 16-inch diameter PVC water main. Construction of approximately 75 water services and reconnection to customer piping. Construction of seven fire hydrant assemblies. Restoration of disturbed areas. Abandonment/Deactivation of approximately 3,100 LF of existing 6-inch diameter water main. Removal/Salvage of three fire hydrants. Modification to approximately 75 services and two valves. Additive Alternate Bid includes regrading of approximately 2,400 LF of existing swale, removal and replacement of approximately 735 LF of 15-inch, 18-inch, and 24-inch diameter culverts, and restoration of disturbed areas. Formal sealed bids/proposals are required. Bids must be received no later than 2:00 p.m. on May 07, 2026. Non-mandatory pre-bid is strongly recommended. All prospective bidders/respondents are cautioned not to contact any member of the staff or officials other than the specified contact person. M/WBE's are encouraged to participate in the bid process.

Post-Bid

Water / Sewer

$1,500,000.00

Public - City

Site Work

17

23

2

5

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 7, 2026

June 8, 2026

Project location map

Lambert Ave, Flagler Beach, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.