BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 3, 2025 at 8:00 PM

Updated July 4, 2025

Site work for a water / sewer project in Flagler Beach, Florida. Completed plans call for site work for a water / sewer project.

1.02.2.1 Install six 2" line stops on four existing 2" galvanized pipes. Terminate these lines from the mains using 2" valves. There are two existing valves that need to be shut off (these are located at the east ends of S. 15th and S. 16th Streets). If these valves cannot be closed completely, then install line stops and new valves similar to the other six. 1.02.2.2 Restore all disturbed areas back to the pre-construction condition or better. The Scope of Work and Specifications. Bids Will Be Received for a Single Prime Contract. Bids Shall Be Submitted as a Lump Sum With Unit Prices as Indicated in the Bid Form. It is the Intent and Purpose of the City of Flager Beach That This Invitation to Bid (Itb) Promotes Competitive Selection. It is the Bidder's Responsibility to Advise the Finance Director if Any Language, Requirements, Etc., or Any Combination Thereof, Inadvertently Restricts or Limits the Requirements Stated in This Itb. Contractor agrees to diligently provide all construction services, materials, and Labor (the "Work") for the performance of Construction of Three Public Works Projects, in accordance with the Scope of Services made part of this Contract, attached hereto as Exhibit A and incorporated herein. The Work shall be completed in accordance with the plans and specifications on file with the City of Flagler Beach, the receipt of which is hereby acknowledged and which are incorporated herein by this reference. Question Deadline 06/17/2025 at 5:00 PM ET scope of the Work or the provisions of the Contract Documents (including, but not limited to, Contract Price or Contract Times), the giving of any such notice will be Contractor's responsibility. The amount of each applicable bond will be adjusted to reflect the effect of any such change. scope of the Work. Contractor shall be responsible for controlling, containing, and duly removing all Constituents of Concern brought to the Site by Contractor, Subcontractors, Suppliers, or anyone else for whom Contractor is responsible, and for any associated costs; and for the costs of removing and remediating any Hazardous Environmental Condition created by the presence of any such Constituents of Concern. Bidder accepts the provisions of the Agreement as to liquidated damages established as Five Hundred ($500) per day beyond the 120 days of total project time.

Award

Water / Sewer

$48,620.00

Public - City

Site Work

5

14

4

4

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
256
Active Projects
125
Bidding Soon
1,761
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 24, 2025

July 24, 2025

Project location map

Multiple Locations, Flagler Beach, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.