Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 13, 2025 at 8:00 PM
Updated August 16, 2025
This is a service / maintenance or supply contract in Flagler Beach, Florida. Contact the soliciting agency for additional information.
As of August 13 2025 this is in construction, but is on hold for a turtle nest The expected construction will likely commence in mid-June 2025 and last 700 days by contract. Construction CEI services will be performed in two tasks: o Task 1: On-Site Construction Inspection, Observations and Meetings o Task 2: Engineering Office Support Task 1: On-Site Construction Observations and Meetings Scope: The selected Engineer will perform regular on-site observations to support the City's construction team during pre-construction and throughout the entire construction period, including: o Attending up to two (2) in-person pre-construction meetings with the Engineer and stakeholders; o Performing site visits and attending in-person meetings. The selected Engineer will be on site eight (8) to sixteen (16) days per month with greater presence during the start and toward the end of construction; o Reviewing construction progress based on the approved schedule maintained by the GC and responding to Engineer inquiries while on site; o Generating daily field reports documenting observations with photographs while on site; o Preparing a pre-punch list as the project is nearing substantial completion; o Preparing a punch list at substantial completion; and, o Performing final walk-through with the City and GC. Dependencies/Special Requirements: o Construction management services and continuous onsite representation are not included and will be provided by the City; o A temporary workspace will be provided by the City or the General Engineer that includes a desk and internet connection; o Construction inspection and materials testing are not included. City staff will be on site to observe construction progress and conformance with the contract documents and to facilitate technical communications, not to perform construction inspection and materials testing tasks; o Pre-construction and construction activities are anticipated to have durations of two (2) and Twenty-one (21) months, respectively. Deliverables: o Daily field visit reports summarizing observations with photographs; o Pre-punch list and punch list following substantial completion. Task 2: Engineering Office Support Scope: The selected Engineer will provide in-office engineering construction support services that include Engineer shop drawing reviews, submittal reviews, responding to Engineer and CM RFIs (requests for additional information) during construction, and participating in virtual meetings with the Engineer and the City's construction management team. Services for this task include: o Reviewing shop drawings and submittals from the Engineer; o Responding to Engineer and CM RFIs expeditiously during construction; o Developing construction sketches, as needed, to clarify the design drawings for the Engineer; o Reviewing Engineer-provided as-built surveys; o Performing required design modifications and issuing drawing revisions, accordingly; o Issuing record drawings following construction completion that include any design modifications and Engineer-provided redlines/as-built surveys; Dependencies/Special Requirements: o Engineer to provide redlines and as-built surveys as they become available; o As-built surveys provided by the Engineer will be signed and sealed by a licensed FL surveyor; o Construction management services and continuous onsite Owner representation is not included and will be provided by the City; o Review and processing of Engineer pay applications is not included; o Environmental permitting compliance support is not included. Deliverables: o RFI responses within ten (10) days of receipt; o Submittals and shop drawing review comments within ten (10) days of receipt; o Record drawings incorporating revisions and Engineer as-built surveys and redline drawings. The selected Engineer will work closely with the City, the City's project manager (PM), the Engineer, and stakeholders toward the WWTF construction's technical alignment with the engineering design and construction documents and produce a set of record drawings following construction completion.
Under Construction
Water / Sewer
$14,142,027.00
Public - City
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 16, 2025
2000 Ave A, Flagler Beach, FL
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.