BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 14, 2026 at 8:00 PM

Updated May 16, 2026

Site work and new construction of a water / sewer project in Williston Park, New York. Completed plans call for the construction of a 2,179-square-foot, one-story above grade water / sewer project.

A. The Work to be done under this Contract and in accordance with these Specifications and Drawings consists of furnishing of plant equipment, superintendents, labor, skill, material and all other items necessary for the construction of the PFAS Treatment at Well 4. The Contractors shall perform all Work required for such construction in accordance with the Contract Documents and subject to the terms and conditions of the Contract, complete and ready for use. B. The Work to be done under this Contract shall be the responsibility of three (3) Prime Contractors, a General Contractor, an Electrical Contractor, and a Plumbing Contractor, each skilled in the work described within the designated Divisions. The Prime Contractors may subcontract such work as requires mechanics other than those normally employed, but the entire responsibility for complete performance of the Contract shall remain with the Prime Contractors. Question Deadline 05/07/2026 at 4:00 PM ET All questions must be submitted, in writing, to Daniela Cruz and Ana Isabel Lebron. Questions must be sent via email to dcruz@db-eng.com and alebron@db-eng.com. This project consists of three separate contracts for compliance with Wicks Law and generally consists of the construction of a new granular activated carbon treatment facility including a new building enclosure and new piping, valves, chemical treatment, standby generator, and all appurtenances and accessories as shown on the Drawings and specified herein. The work also includes all associated connections to the existing well at the site, power, controls, SCADA, all wiring and devices, drainage, site paving and restoration, and other utility work as shown and called for in conformance with the Contract Documents. Contractors shall comply with all NYS Environmental Facilities Corporation (NYS EFC), Minority/Women's Business Enterprise (M/WBE), and Service-Disabled Veteran Owned Business (SDVOB) Program requirements. Construction of a new granular activated carbon treatment facility, a new building to house the system, as well as miscellaneous site, drainage, and building upgrades. Project has state and federal funding.

GC Bidding

Water / Sewer

$4,000,000.00

Public - City

New Construction, Site Work

112

35

24

6

Subscribe For Documents

38 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,046
Active Projects
524
Bidding Soon
5,376
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 21, 2026

July 20, 2026

Project location map

Multiple Locations, Williston Park, NY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.