BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 10, 2026 at 8:00 PM

Updated May 20, 2026

Site work and paving for a road / highway in Groveland, Florida. Conceptual plans call for site work for a road / highway.

The project at the intersection of State Road (S.R.) 19 and Cherry Lake Road in Lake County is intended to improve overall safety and traffic operations. A traffic services study conducted by the Department determined that a new traffic signal is warranted at this location. As part of the Traffic Operations Pushbutton Program, the project includes installation of a new traffic signal without pedestrian signals, along with RISA lighting within the intersection area to support the new infrastructure and improve visibility.

Conceptual

Roads / Highways

$250,000.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 21, 2026

Project location map

FL-19 & Cherry Lake Rd, Groveland, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.