Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 12, 2026 at 8:00 PM
Updated May 16, 2026
Site work and paving for a mixed-use development in Stuart, Florida. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; and sidewalk / parking lot.
Limits: 89030000 Total Roadway Length: 0.235 Miles Contract Days: 389 Total Bridge Length: 0.233 Miles Total Proposal Length: 0.468 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: Description: The Improvements under this Contract consist of, but are not limited to, MOT (standard, ped escort/flagger, barrier-mount sign, ped LCD, barricade), moveable bridge (remove, maintenance, repair, span locks, span locks remove, electrical, drive system, control house renovate, plumbing, operator, functional checkout), moveable bridge machinery and casting rehab (recondition gearing, adjust/modify shoes, logic controller, switches/transducers, control console, control console remove), moveable bridge counterweight (balance blocks, adjust, clean), bridge deck (concrete overlay, restore spalled areas, penetrant sealer), pier (cathodic protection), fender system (remove, polymeric), ladders and platforms (rehab, new), structural steel (rehab, repair welds, coating, misc.), flooring (roadway steel, sidewalk aluminum), concrete (removal, sidewalk, driveways, parapet), railing (handrail/guiderail, bullet), manhole adjustments, and sod along NW Dixie Highway over St. Lucie River, Bridge No. 890003, for 0.235 miles in the City of Stuart, Martin County. Pre-qualified: Contractor Must Be Pre-qualified. Performance Bond: A Contract / Performance Bond is Required for This Project Question Deadline 05/01/2026 at 5:00 PM ET, Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - 001 - Bascule Bridge Rehabilitation - SR-707/Dixie Hwy
Bid Results
Bridges / Tunnels
$7,470,362.00
Public - State/Provincial
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
7
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
