BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 12, 2026 at 8:00 PM

Updated May 16, 2026

Site work and paving for a mixed-use development in Stuart, Florida. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Limits: 89030000 Total Roadway Length: 0.235 Miles Contract Days: 389 Total Bridge Length: 0.233 Miles Total Proposal Length: 0.468 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: Description: The Improvements under this Contract consist of, but are not limited to, MOT (standard, ped escort/flagger, barrier-mount sign, ped LCD, barricade), moveable bridge (remove, maintenance, repair, span locks, span locks remove, electrical, drive system, control house renovate, plumbing, operator, functional checkout), moveable bridge machinery and casting rehab (recondition gearing, adjust/modify shoes, logic controller, switches/transducers, control console, control console remove), moveable bridge counterweight (balance blocks, adjust, clean), bridge deck (concrete overlay, restore spalled areas, penetrant sealer), pier (cathodic protection), fender system (remove, polymeric), ladders and platforms (rehab, new), structural steel (rehab, repair welds, coating, misc.), flooring (roadway steel, sidewalk aluminum), concrete (removal, sidewalk, driveways, parapet), railing (handrail/guiderail, bullet), manhole adjustments, and sod along NW Dixie Highway over St. Lucie River, Bridge No. 890003, for 0.235 miles in the City of Stuart, Martin County. Pre-qualified: Contractor Must Be Pre-qualified. Performance Bond: A Contract / Performance Bond is Required for This Project Question Deadline 05/01/2026 at 5:00 PM ET, Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - 001 - Bascule Bridge Rehabilitation - SR-707/Dixie Hwy

Bid Results

Bridges / Tunnels

$7,470,362.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

47 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 8, 2026

May 18, 2026

Project location map

NW Dixie Hwy, Stuart, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.