BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 21, 2026 at 8:00 PM

Updated May 23, 2026

Site work for a power facility in East Fayetteville, North Carolina. Completed plans call for site work for a power facility.

Fayetteville Public Works Commission ("PWC") is seeking the services of a qualified Design-Builder to provide design and construction services related to Battery Energy Storage System (BESS) - 5 MW Battery Energy Storage System, located at the Sally Hill Solar Farm. The purpose of this project is to design and install a utility-scale 5 MW BESS. The system will consist of a five (5) megawatt (MW) BESS, wiring, inverters, and controls. PWC has selected a 2-hour battery discharge capacity duration. PWC purchases its power from Duke Energy Progress (DEP). This project will allow PWC to discharge the battery during periods of high electric demand, reducing the coincident peak with DEP. The BESS will be dispatchable, scheduled to discharge during anticipated peak demand times. PWC will own and operate the project upon completion. Third-party ownership will not be a considered option. It is anticipated that the design-builder will include a licensed contractor or contractor(s) and a professional engineering firm. All firms shall be licensed in the State of North Carolina. The contractor(s) shall have the following license classifications: Building - unlimited Electrical - unlimited This project involves the design and construction of a 5 MW BESS. Close coordination between the selected DB and PWC will be required on the selected battery system, design, and connection between the BESS, the existing solar farm, and PWC’s electrical distribution system. It is anticipated that the BESS will be located at the existing Sally Hill (Gillespie Street) Solar Facility. It will connect to PWC’s distribution system at 12.47 KV. The BESS will be integrated into PWC’s existing SCADA system, as PWC personnel will be responsible for scheduling the battery discharge and recharge. Question Deadline 05/08/2026 at 4:00 PM ET Written questions shall be e-mailed to procurement@faypwc.com . PWC reserves the right to reject any or all submittals.

Post-Bid

Solar Power Generation

$5,000,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
242
Active Projects
143
Bidding Soon
2,527
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 22, 2026

September 22, 2026

Project location map

Multiple Locations, East Fayetteville, NC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.