Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 15, 2026 at 8:00 PM
Updated May 21, 2026
Site work for a bridge / tunnel in Culloden, Georgia. Completed plans call for site work for a bridge / tunnel.
For Bridge Maintenance and Repair. The qualified firms who have been awarded a Master Service Agreement (MSA) through the prequalification process #48400-410-000021912. The Department reserves the right to modify existing provisions or include additional provisions, which are not currently addressed herein and further reserves the right to reject any or all bids, and to waive technicalities and informalities at its discretion. Scope of Work to be Performed The Contractor will be required to perform prep work, removal, installation and cleanup for Bridge Maintenance and Repair defined in this ITB. The Contractor shall supply labor, equipment, tools, means of transportation, traffic control, and incidentals to perform work in accordance to specifications, and to ensure a safe work environment for employees and the traveling public within the time schedule specified. 1. Scope Work under this ITB consists of furnishing all labor, materials, tools, equipment, means of transportation, and incidentals necessary to perform the services. Contractor must furnish equipment in good operating condition and operated by properly trained and qualified personnel. The Contractor must make a good faith effort to furnish the Department the fully operational equipment needed to perform Bridge Maintenance and Repair at such time, and at such location(s) as directed by the Engineer. Prior to start of work, Contractor must inspect equipment to ensure the equipment is fully operational for the performance of its intended purpose. The Contractor will also be responsible for any traffic control, licenses, and permits required to satisfy the duties required herein. When replacing PCC Slabs, the contractor is not allowed to remove the existing slab without being able to puor concrete within seven (7) calendar days of opening the road surface. 2. Deliverables Delivery of Bridge Maintenance and Repair shall be in accordance with the contract terms. The following deliverables are expected for work performed at the locations referenced in Exhibit 4 - Locations, Descriptions and Estimated Quantities. Question Deadline 04/17/2026 at 2:00 PM ET Question submitted Electronically
Post-Bid
Bridges / Tunnels
Public - State/Provincial
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 27, 2026
May 27, 2026
GA-22, Culloden, GA
Related To This Project
Culloden, GA
Bid Date: Jan 17 2025
Culloden, GA
Bid Date: Jun 10 2024
Culloden, GA
Bid Date: Nov 30 2022
Athens, GA
Bid Date: May 26 2026
Eatonton, GA
Bid Date: Apr 27 2026
Jeffersonville, GA
Bid Date: Jun 02 2026
Cleveland, GA
Bid Date: May 26 2026
Atlanta, GA
--
Morrow, GA
--
Dalton, GA
--
Kennesaw, GA
--
Ball Ground, GA
Bid Date: May 21 2026
Atlanta, GA
Bid Date: May 20 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
