BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 15, 2026 at 8:00 PM

Updated May 21, 2026

Site work for a bridge / tunnel in Culloden, Georgia. Completed plans call for site work for a bridge / tunnel.

For Bridge Maintenance and Repair. The qualified firms who have been awarded a Master Service Agreement (MSA) through the prequalification process #48400-410-000021912. The Department reserves the right to modify existing provisions or include additional provisions, which are not currently addressed herein and further reserves the right to reject any or all bids, and to waive technicalities and informalities at its discretion. Scope of Work to be Performed The Contractor will be required to perform prep work, removal, installation and cleanup for Bridge Maintenance and Repair defined in this ITB. The Contractor shall supply labor, equipment, tools, means of transportation, traffic control, and incidentals to perform work in accordance to specifications, and to ensure a safe work environment for employees and the traveling public within the time schedule specified. 1. Scope Work under this ITB consists of furnishing all labor, materials, tools, equipment, means of transportation, and incidentals necessary to perform the services. Contractor must furnish equipment in good operating condition and operated by properly trained and qualified personnel. The Contractor must make a good faith effort to furnish the Department the fully operational equipment needed to perform Bridge Maintenance and Repair at such time, and at such location(s) as directed by the Engineer. Prior to start of work, Contractor must inspect equipment to ensure the equipment is fully operational for the performance of its intended purpose. The Contractor will also be responsible for any traffic control, licenses, and permits required to satisfy the duties required herein. When replacing PCC Slabs, the contractor is not allowed to remove the existing slab without being able to puor concrete within seven (7) calendar days of opening the road surface. 2. Deliverables Delivery of Bridge Maintenance and Repair shall be in accordance with the contract terms. The following deliverables are expected for work performed at the locations referenced in Exhibit 4 - Locations, Descriptions and Estimated Quantities. Question Deadline 04/17/2026 at 2:00 PM ET Question submitted Electronically

Post-Bid

Bridges / Tunnels

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
202
Active Projects
110
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 27, 2026

May 27, 2026

Project location map

GA-22, Culloden, GA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.