BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 8, 2026 at 8:00 PM

Updated May 15, 2026

Site work and outdoor lighting for a civil project in Edmonton, Alberta. Completed plans call for site work for a bridge / tunnel; road / highway; and for outdoor lighting for a road / highway.

Clearing, Grading, Granular Base Course, Asphalt Concrete Pavement and Other Work 40:30 to :32, S. of Pinto Creek to N. of Berland River, AB kilometre 53.910 to 57.220 kilometre 9.400 to 25.200 Grading, Granular Base Course, Asphalt Concrete Pavement, Street Light Installation and Other Work 40:32, Safety Rest Area - Adjacent to the N.B.L. of Hwy. 40, S. of the Berland River, AB Construction of S.P.C.S.P. Culvert, Grouting and Abandoning of Existing Culvert and Other Work 40:30, B.F. 77193 - Carrying Hwy 40 over a Watercourse, N. of Entrance, AB Construction of S.P.C.S.P. Culvert, Removal and Disposal of Existing Culvert and Other Work 40:30, B.F. 77194 - Carrying Hwy 40 over Pinto Creek, N. of Entrance, AB Construction of Precast Prestressed Concrete Girder Bridge, River Training, Demolition of Existing Bridge Structure and Other Work 40:32, B.F. 77196 - Carrying Hwy. 40 over the Tributary to Fox Creek, S. of the Berland River, AB Construction of Structural Steel Girder Bridge, Bank Protection, Demolition of Existing Bridge Structure and Other Work 40:32, B.F. 74710 - Carrying Hwy. 40 over the Berland River, AB NORTH CENTRAL REGION APPROXIMATE QUANTITIES: 1 Lump Sum Environmental Management 276,016.25 Tonne Supply of Aggregate - With Option 5.7 Hectare Clearing, Timber Salvage and Mulching 41,130 Cubic Metre Rippable Rock Excavation - Premium 685,490 Cubic Metre Common Excavation 46,060 Cubic Metre Borrow Topsoil Excavation 72,000 Cubic Metre Borrow Excavation 59,500 Cubic Metre Common and/or Borrow Excavation Loaded to Trucks 252,170 Cubic Metre Kilometre Overhaul 218 Metre Culverts - Supply and Install (600 mm dia. C.S.P.) 286 Metre Culverts - Supply and Install (800 mm dia. C.S.P.) 84 Metre Smooth Wall Steel Pipe - Supply and Install (900 mm dia.) 76 Metre Smooth Wall Steel Pipe - Supply and Install (1 200 mm dia.) 3,730 Cubic Metre Filter Material Des. 8 Class 25 1,930 Metre Turbidity Curtain - 1.5 m High 1,830 Cubic Metre Heavy Rock Riprap (Class 1) 2,650 Cubic Metre Heavy Rock Riprap (Class 1M) 12,770 Square Metre Turf Reinforcement Mat (Type C) 33,770 Square Metre Erosion Control Soil Covering - Supply and Install (Type C) 3,220 Metre Synthetic Permeable Ditch Barrier 769,340 Square Metre Topsoil Placement 46.93 Hectare Drill Seeding 19.60 Hectare Hydro-Seeding 240,400 Square Metre Slope Texturing 8.7 Hectare Tree Planting - 2 m x 2 m Grid 234,960 Square Metre Preparing Subgrade Surface (First Layer) 196,800 Tonne Granular Base Course Des. 2 Class 25 33,910 Metre Cutting of Pavement 1,890 Metre Crack Repair - Shallow Mill and Fill 34,380 Square Metre Cold Milling Asphalt Pavement - 50 mm Depth 57,570 Tonne Asphalt Concrete Pavement - EPS Mix Type H2 (PG 58-28) 9,890 Tonne Asphalt Concrete Pavement - EPS Mix Type S3 (PG 58-28) 19,11 Kilometre Roadway Lines - Supplying Paint and Painting (Directional Dividing and 2 Edge Lines) 31.80 Kilometre Milled Rumble Strip - Shoulder B.F. 77193 - Carrying Hwy 40 over a watercourse near Entrance 1 Lump Sum Traffic Accommodation for Bridge Construction (B.F. 77193) 1 Lump Sum Grouting of Abandoned Culverts (B.F. 77193) 1 Lump Sum SPCSP - Supply (B.F. 77193) 1 Lump Sum SPCSP - Assembly (B.F. 77193) B.F. 77194 - Carrying Hwy 40 over Pinto Creek near Entrance 1 Lump Sum Traffic Accommodation for Bridge Construction (B.F. 77194) 1 Lump Sum Demolition and Disposal of Bridge Structure (B.F. 77194) 1 Lump Sum SPCSP - Supply (B.F. 77194) 1 Lump Sum SPCSP - Assembly (B.F. 77194) B.F. 77196 - Carrying Hwy 40 over the Tributary to Fox Creek, 67 Km NW of Hinton 1 Lump Sum Traffic Accommodation for Bridge Construction (B.F. 77196) 1 Lump Sum Demolition and Disposal of Bridge Structure (B.F. 77196) 1 Lump Sum Headslope Preparation and Backfill - (B.F. 77196) 306 Metre Supply of Piling - Plain Steel H-Pile - 310 x 79 mm (B.F. 77196) 18 Pile Pile Set-up (Driven Piles) - H-Pile (B.F. 77196) 185 Metre Supply of Piling - Plain Steel Pipe Pile - 610mm dia. x 9.5mm (B.F. 77196) 265 Metre Pile Driving - Pipe Pile (B.F. 77196) 1 Lump Sum Precast Concrete Units - Supply and Fabrication, Delivery and Erection - 8 m SLC-510 (B.F. 77196) 1 Lump Sum Precast Concrete Units - Supply and Fabrication, Delivery and Erection - 10 m SLC-510 (B.F. 77196) 78 Cubic Metre Pile Concrete (Class) - Supply and Place (B.F. 77196) 50 Cubic Metre Concrete (Class C) - Supply and Place (B.F. 77196) B.F. 74710 - Carrying Hwy 40 over the Berland River, 62 Km N. of Entrance 1 Lump Sum Demolition and Disposal of Bridge Structure (B.F. 74710) 1 Lump Sum Excavation - Structural (B.F. 74710) 16 Pile Drill Rig Set-up (Drilled Piles) - 600 mm Dia. Concrete Pile (B.F. 74710) 192 Metre Pile Installation (Drilled Piles) - 600 mm Dia. Concrete Pile (B.F. 74710) 307 Cubic Metre Concrete (Class HPC) - Supply and Place (B.F. 74710) 37,692 Kilogram Corrosion Resistant Reinforcing Steel - Supply (B.F. 74710) 1 Lump Sum Structural Steel - Supply and Fabrication, Delivery and Erection (B.F. 74710) 1 Lump Sum Bridgerail - Supply and Fabrication, Delivery and Installation (B.F. 74710) 2,800 Cubic Metre Heavy Rock Riprap (Modified Class 3) - (B.F. 74710) Contractor to supply all materials. Question Deadline 06/08/2026

GC Bidding

Bridges / Tunnels

$10,000,000.00

Public - State/Provincial

Outdoor Lighting, Site Work

76

8

3

Subscribe For Documents

133 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
100
Active Projects
43
Bidding Soon
352
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 11, 2026

October 1, 2026

Project location map

Multiple Locations, Edmonton, AB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.