BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 8, 2026 at 8:00 PM

Updated May 15, 2026

Site work, paving and outdoor lighting for a mixed-use development in Rochester, New Hampshire. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and for outdoor lighting for a road / highway.

The project involves reconstructing the intersection of Milton Road (NH 125) and Salmon Falls Road with a single-lane roundabout. The approach work on Milton Road begins approximately 630 feet south of the existing intersection and proceeds to 660 feet north of the existing intersection. The approach work on Salmon Falls Road begins approximately 435 feet southeast of the existing intersection. The center of the proposed roundabout is approximately 170 feet south of the existing intersection. The roundabout incorporates a driveway for Lambert’s Auto Salvage in the northeast corner and a major entrance for Sig Sauer’s development to the west. Additionally, the project will reconstruct the intersection of Milton Road (NH 125) and Cross Road to provide a northbound left-turn lane and raised median, with Cross Road approach work beginning approximately 150 feet northwest of the intersection. The existing water main within the project limits will be reconstructed, and the existing sewer main will be extended approximately 620 feet north within the project limits. The project also reconstructs and expands the existing closed drainage system and constructs a large drainage swale at the closed system outlet. Ancillary construction includes curbing, sidewalk, and roadway lighting. To be considered a responsive bidder, you must be registered with the Issuing Office as a plan holder and have obtained at least one set of bidding documents using the name that will appear on the Bid Form. Bids must be submitted either as hardcopy or electronically according to the detailed instructions. Bidders must be listed on the NHDOT "Prequalified Contractor’s List" with a classification of road construction and water/sewer construction, and provide written documentation from NHDOT to the designated recipient no later than three business days prior to the bid opening. Questions regarding the bidding documents must be submitted in writing at least seven business days before the bid opening; addenda will be issued no later than five business days prior to the opening. It is the bidder’s responsibility to monitor the designated website and email for any addenda or updates. Refer to the detailed instructions included in the bidding documents for all contract requirements regarding notifications, submittal procedures, qualifications, and contract award. Question Deadline 04/27/2026 All technical questions regarding this project should be directed by email to Heidi Marshall, hmarshall@hoyletanner.com. Bidder is required to visit the Site and conduct a thorough visual examination of the Site and adjacent areas. During the visit the Bidder must not disturb any ongoing operations at the Site. Bidder must conduct the required Site visit during normal working hours. Replace pages 00520-1, 00520-2, and 00550-1 with the attached pages reflecting the updated date of Substantial Completion to August 27, 2027

Post-Bid

Roads / Highways

$3,000,000.00

Public - City

Outdoor Lighting, Paving, Site Work

86

10

6

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
425
Active Projects
223
Bidding Soon
1,926
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 6, 2026

June 4, 2026

Project location map

Milton Rd, Rochester, NH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.