Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 13, 2026 at 8:00 PM
Updated May 15, 2026
Renovation of a mixed-use development in Lodi, California. Completed plans call for the renovation of a educational facility.
OPEN TO B and C38 CUPCCAA CONTRACTORS Provide all labor, materials, taxes, transportation, equipment, and services necessary for the demolition, removal, and replacement of existing walk-in refrigerator and freezer boxes and associated refrigeration equipment. Work shall be complete, operational, and compliant with all applicable codes and District requirements. The contractor is responsible for any and all permit fees. DEMOLITION & REMOVAL Demolish and remove existing walk-in refrigerator and freezer boxes and associated refrigeration equipment. Off haul and dispose of material in accordance with local waste regulations. Remove and dispose of existing refrigeration line sets. Properly recover, dispose, and document existing refrigerant in accordance with EPA and State regulations. Repair back walls where moisture damage has occurred. Re-brace bottom wall plate and lower metal studs as required. Patch, repair, and replace sheetrock as needed. Any major structural damage discovered shall be brought to the District's attention McNair Walk-in Fridge Provide all labor, materials, taxes, transportation, equipment, and services necessary for the demolition, removal, and replacement of existing walk-in refrigerator and freezer boxes and associated refrigeration equipment. Work shall be complete, operational, and compliant with all applicable codes and District requirements. The contractor is responsible for any and all permit fees. Projected Project Start Date: 06/01/2026 Estimated Time of Completion: 7/20/2026 The successful Bidder shall be required to furnish a 100% Performance Bond and a 100% Payment Bond if it is awarded the contract for the Work. The Board reserves the right to reject any and all bids and/or waive any irregularity in any bid received. Unless otherwise required by law, no bidder may withdraw its bid for ninety (90) days after the date of the bid opening. Question Deadline 04/22/2026
Bid Results
Educational
$160,211.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 28, 2026
June 1, 2026
To Be Determined, Lodi, CA
Related To This Project
Lodi, CA
Bid Date: Apr 27 2026
Lodi, CA
Bid Date: Jun 09 2026
Lodi, CA
Bid Date: May 06 2026
Lodi, CA
Bid Date: May 14 2026
Lodi, CA
Bid Date: Jun 04 2026
Lodi, CA
Bid Date: Apr 23 2026
Lodi, CA
Bid Date: Apr 29 2026
RFP - Compressed Natural Gas (CNG) Compressor Procurement and Fueling Station Improvements - 6088857
Lodi, CA
Bid Date: May 06 2026
Lodi, CA
Bid Date: Apr 02 2026
Lodi, CA
Bid Date: Mar 25 2026
Lodi, CA
Bid Date: Apr 13 2026
Lodi, CA
Bid Date: Mar 02 2026
Lodi, CA
Bid Date: Mar 18 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
