BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 24, 2026 at 8:00 PM

Updated May 20, 2026

Renovation of a mixed-use development in San Francisco, California. Completed plans call for the renovation of a 78-unit multi-residential development.

Period Of Contract: March 2026 through Project Completion 685 Ellis is a 78-unit single room occupancy building providing semi-congregate interim housing for people transitioning out of homelessness in the Tenderloin neighborhood of San Francisco. The John Stewart Company will rehabilitate this building to include 8 accessible units and convert it to permanent supportive housing. The 4,695 s.f. lot is located a short walk from Civic Center BART, a park, and a library. The seven-story reinforced masonry structure was built around 1927 and was previously used as a tourist hostel. This concrete and steel building's historic value may affect treatment of the facade and interior space. The building requires structural, electrical, and plumbing upgrades, as well as a new elevator for accessibility. All residents will be permanently relocated prior to the start of construction. The rehabilitation will include a change of occupancy and substantial reconfiguration of building systems and interior layouts to include proposed program listed below. The final unit count is anticipated to be approximately 70 studio dwelling units, subject to accessibility requirements, and existing elevator will be replaced with new code compliant elevator requiring larger shaft. The following project milestones are estimated as follows: o Conceptual/Schematic Design Complete: 8/15/2026 o Design Development Complete: 11/1/2026 o Construction Documents Complete: 3/15/2027 o Permit Submittal 8/1/2027 o Start of Bidding/ Negotiations: 9/15/2027 o Construction Start 12/1/2027 o Construction Completion (14 mos) 2/1/2029 The selected firm will be expected to begin work immediately upon selection in May 2026. Construction is expected to begin in October 2027. March 31, 2026 at 5:00PM PST Deadline for submission of written questions (email questions to Don Lusty at dlusty@jsco.net).

Post-Bid

Multi-Residential

$21,500,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
498
Active Projects
259
Bidding Soon
3,604
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 21, 2026

October 1, 2027

Project location map

685 Ellis St, San Francisco, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.