Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 5, 2026 at 7:00 PM

Updated November 10, 2026

Renovation of a mixed-use development in North Little Rock, Arkansas. Working plans call for the renovation of a medical facility.

The NLR campus is short of reserve water capacity. This project includes a new elevated water storage tank. The new tank installation shall include all labor and materials required for a complete and operational system including, but not limited to, supporting structure, piping, appurtenances, and accessories as required. The existing elevated 250,000-gallon water tower shall be demolished in its entirety including all below grade supporting structure, piping vaults, etc. The demolition shall be in strict accordance with the phasing schedule. A new pump house with new pumps and new pump controls is included in this project. Physical and operational security, monitoring, controls, redundancy and emergency power are included. The new pump house installation shall include all labor and materials required for a complete and operational system including, but not limited to, structure, fence, paving, piping, cameras, access control, emergency generator, appurtenances, and accessories as required. A new automated control system that interlocks to and also controls the existing south pump house as well as the new north pump house is included in this project. The new system shall be seamlessly integrated into the existing automation system currently operating the south pump house. This project also replaces all existing, failing cast iron, ductile iron, galvanized, asbestos cement, and/or any other material water pipe with new pipe as shown on the project plans. The water supply lines are generally looped to improve supply redundancy and improve the water pressure. Additionally, new backflow preventers shall be installed on the Fire Protection supply lines to buildings which have fire protection systems. This installation will include pressure testing, disinfecting, and hyper-chlorinating as required for new piping installation per Federal, State, and Local codes The period of performance is 720 calendar days after issuance of the Notice to Proceed. The method of Contractor Selection has not been Determined at this time. Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Final Planning

Medical

$50,000,000.00

Public - Federal

Renovation

Our team is requesting plans for this project.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
84
Active Projects
33
Bidding Soon
487
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 28, 2026

Project location map

2200 Fort Roots Dr, North Little Rock, AR

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed