Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 11, 2026 at 8:00 PM
Updated May 16, 2026
Site work and paving for a road / highway in John Day, Oregon. Completed plans call for site work for a road / highway; and for paving for a road / highway.
The purpose of this ITB is to establish a contract for US26/US395: District 14 MBM 2026 Project (the "Project") for the benefit of the Oregon Department of Transportation ("ODOT") (the "Contract"). The work to be performed under the Contract includes all labor, materials, transportation, equipment, permits, and services for and incidental to the completion of all construction work in connection with the Project in strict accordance with the Contract Documents. The work, includes, but is not limited to: Pave various bridges along US 26 between MP 155.75 and MP 189.36 as well as a bridge on US395 at MP 118.55. The following range is a Project estimate for bonding purposes: $100,000 to $250,000 Question Deadline 04/23/2026 Deadline for solicitation protests, requests for change, requests for clarification, requests for approval of equivalents, and questions Rick Elltiott email: Rick.ELLIOTT@odot.oregon.gov / phone: _541.786.2244_ *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Roads / Highways
$112,700.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 30, 2026
June 30, 2026
Multiple Locations, John Day, OR
Related To This Project
John Day, OR
Bid Date: May 06 2026
John Day, OR
Bid Date: May 15 2026
John Day, OR
Bid Date: May 05 2026
John Day, OR
Bid Date: Apr 01 2026
John Day, OR
Bid Date: Apr 01 2026
John Day, OR
Bid Date: Mar 05 2026
John Day, OR
Bid Date: Oct 15 2025
John Day, OR
Bid Date: Mar 30 2021
John Day, OR
Bid Date: Aug 18 2025
John Day, OR
Bid Date: Sep 29 2025
John Day, OR
Bid Date: Apr 09 2025
John Day, OR
Bid Date: Mar 19 2025
John Day, OR
Bid Date: Mar 19 2025
John Day, OR
Bid Date: Aug 22 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
