Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 10, 2026 at 8:00 PM
Updated May 16, 2026
Site work and paving for a road / highway in North Attleboro, Massachusetts. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Estimated value of $4,792,954.00 Kelley Blvd Roadway Improvements Question Deadline 04/29/2026 at 12:00 PM ET Inquiries regarding the "Kelly Blvd Roadway Improvements" shall be sent, in writing, to Mark Hollowell at the email: mhollowell@nattleboro.com. To be considered, all inquiries must be received no later than date and time. The work to be done under this contract consists of furnishing all necessary labor, materials and equipment required for the improvements to Kelley Blvd / Taunton Street (Route 152) from 15 Taunton Street in the Town of Plainville, MA to 537 Kelley Blvd in the Town of North Attleborough, MA. The project limits also include Messenger Street (Route 106) from 2 Wilkins Drive to 64 Messenger Street. The work also consists of modifying the traffic signal infrastructure at the intersection of Route 152 and Route 106. The project will include Work necessary to complete the roadway improvements in accordance with the plans and these Special Provisions. The project generally includes, but is not limited to, roadway reconstruction, pavement milling, roadway resurfacing, installation of granite curb, construction of new sidewalks and reconstruction of existing sidewalks including new pedestrian curb ramps and driveways, modification of road geometry and striping to provide additional lanes at the approach to the Route 152/106 intersection, new traffic signal infrastructure, and improvements to drainage infrastructure, as more fully described on the Contract Drawings. The Contract includes coordination with utility companies to complete utility pole relocations and below ground conduit relocations. The Contract between the successful Bidder and the Town shall be for a term of 470-days consecutive days commencing in June 2026 and ending in September of 2027.
Post-Bid
Roads / Highways
$4,792,954.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 8, 2026
June 1, 2026
Kelley Blvd, North Attleboro, MA
Related To This Project
North Attleboro, MA
Bid Date: May 07 2026
North Attleboro, MA
Bid Date: May 20 2026
North Attleboro, MA
Bid Date: Mar 25 2026
North Attleboro, MA
Bid Date: May 07 2026
North Attleboro, MA
Bid Date: Mar 27 2026
North Attleboro, MA
Bid Date: Feb 16 2026
North Attleboro, MA
Bid Date: Mar 06 2026
North Attleboro, MA
Bid Date: Feb 19 2026
North Attleboro, MA
Bid Date: Feb 04 2026
North Attleboro, MA
--
North Attleboro, MA
Bid Date: Dec 05 2025
North Attleboro, MA
Bid Date: Dec 05 2025
North Attleboro, MA
Bid Date: Nov 06 2025
North Attleboro, MA
Bid Date: Nov 13 2025
North Attleboro, MA
Bid Date: Nov 20 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
