BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 9, 2026 at 8:00 PM

Updated June 10, 2026

Site work for a water / sewer project in Carrabelle, Florida. Conceptual plans call for site work for a water / sewer project.

The City of Carrabelle requests proposals from qualified individuals or firms to provide Construction Engineering services for a Community Development Block Grant Disaster Recovery (CDBG-DR) Rebuild Florida General Infrastructure Repair Program. The scope includes engineering services for the Sanitary Sewer Collection and Treatment System Repair and Hardening Project, which experienced damage during Hurricane Helene. Tasks will include bidding, construction administration, and periodic construction observation services. Design and permitting tasks have already been completed. Proposals must be submitted in one original and three copies in a sealed envelope marked 'SEALED PROPOSAL FOR CDBG ENGINEERING SERVICES.' Proposals will be evaluated based on knowledge of state and federal regulations, experience with CDBG projects, management and staffing, ability to quickly become familiar with local conditions, experience with municipal engineering projects, and approach to task. No proposal will be accepted from individuals or firms on the convicted vendor list. The City of Carrabelle Reserves the Right to Reject Any and All Proposals, to Waive Any Informalities or Irregularities in the Proposal Process and to Award the Contract(S) in the Best Interest of the City. The Evaluation Criteria That Will Be Utilized in the Selection of the Engineer Are as Follows: 1. Knowledge of State and Federal Regulations Governing the Cdbg Program as Well as Other Grant Programs; 20 Pts. 2. Experience With Cdbg Funded Projects; 20 Pts. 3. Management and Staffing, Organizational Charts, Resumes, Etc; 20 Pts. 4. Ability to Become Quickly Familiar With Local Conditions; 20 Pts. 5. Experience With Municipal Engineering Projects 10 Pts 6. Approach to Task 10 Pts The method of Contractor Selection has not been Determined at this time. The City Has Been Awarded Cdbg Grant #ms040 in the Amount of, $2,569,775.00 Therefore, Procurement and Contracting Will Follow Cdbg Regulations.

Conceptual

Water / Sewer

$3,000,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 14, 2026

June 9, 2027

Project location map

To be determined, Carrabelle, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.