BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 30, 2026 at 8:00 PM

Updated May 20, 2026

Renovation of an educational facility in North Adams, Massachusetts. Completed plans call for the renovation of a educational facility.

Inviting written responses from qualified contractors for a gymnasium floor refinishing project located in North Adams, MA. In general, the project includes all labor, materials, equipment, and supervision necessary to complete the work in accordance with the Scope of Work Statement outlined in the Request for Response (RFR). Contractor Qualification Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Scope of Work o Lightly sand (screen) the existing 17,160 square-foot gymnasium hardwood floor using 150 grit abrasive screening to remove surface wear and prepare the surface for refinishing. Existing court lines and logos shall remain intact. o Thoroughly clean the floor to remove all sanding dust and debris prior to finishing. o Apply two (2) coats of clear, commercial-grade oil-based polyurethane finish suitable for athletic hardwood floors, in accordance with manufacturer specifications. Allow proper drying and curing time between coats and prior to reopening the floor for use.o Protect adjacent walls, equipment, and building components from dust, finish, or damage. The gymnasium bleachers will remain in their closed position throughout the duration of the project. o Provide adequate ventilation during finish application and curing and comply with all applicable safety, environmental, and VOC regulations. Existing Conditions o The Contractor shall visually inspect the floor prior to commencing work and notify the College of any observed conditions that may affect the work. o Minor surface blemishes consistent with light sanding are anticipated. Floor repairs, board replacement, or correction of latent defects are not included unless specifically authorized in writing. Schedule and Access o Work shall be scheduled and coordinated with the Director of MCLA Facilities.

Post-Bid

Educational

$10,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
503
Active Projects
263
Bidding Soon
3,026
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 29, 2026

May 29, 2026

Project location map

375 Church St, North Adams, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.