BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 1, 2026 at 8:00 PM

Updated May 16, 2026

Site work and paving for a road / highway in Saranac Lake, New York. Completed plans call for site work for a road / highway; and for paving for a road / highway.

INSTALLATION OF PAVEMENT, THAT WILL BE SUPPLIED AND HAULED BY VARIOUS GOVERNMENT MUNICIPALITIES THROUGHOUT THE ADIRONDACKS Item #1 is for the price per DAY for the installation of Type 7F Top Course and/or Type 3 Binder Course. The local municipality that you will be paving for will purchase all materials as well as provide trucking for said material from the plant to the jobsite. The Municipality will also provide all flagging operations as well as any necessary traffic control devices. Municipality will also provide all water necessary for the contractor's roller. The price per DAY is to include the paver, paver operator, 2 screed men, dump man, laborer, roller, and roller operator. Some trueing and leveling may be needed prior to the final course being applied. Typical paving depth will be 1.5" compacted for all type 7F top course and 2.5" and 3" compacted on all Type 3 binder courses. Also listed below are the hours and days that each government agency will be working during paving operations. Below is a list of Municipalities participating in this bid as well as location and tonnage: Village of Saranac Lake (Mon thru Fri - 7 AM thru 3 PM) Ampersand Ave-270 Tons (Binder Course 3" compacted) Grove St-150 Tons (Type 7F Top Course 1.5" compacted) Lake St-270 Tons (Type 7F Top Course 1.5" compacted) Ampersand Ave-140 Tons (Type 7F Top Course 1.5" compacted) Seneca Ave-120 Tons (Type 7F Top Course 1.5" compacted) Dorchester Rd-100 Tons (Type 7F Top Course 1.5" compacted) John Munn Rd-231 Tons (Type 7F Top Course 1.5" compacted) Fairview Ave-60 Tons (Type 7F Top Course 1.5" Compacted) Franklin Ave-160 Tons (Type 7F Top Course 1.5" compacted) Item #2 is for the price for mobilization and demobilization to the jobsite.

Post-Bid

Roads / Highways

$40,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
223
Active Projects
114
Bidding Soon
1,002
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 6, 2026

June 5, 2026

Project location map

Multiple Locations, Saranac Lake, NY


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.