Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 19, 2026 at 8:00 PM
Updated May 21, 2026
Site work, paving and new construction of a playground / park / athletic field in Saranac Lake, New York. Completed plans call civil work for a playground / park / athletic field.
The Department hereby establishes an overall goal of 6% for SDVOB participation, For purposes of this procurement, the Department hereby establishes an overall goal of 30% for Minority and Women-Owned Business Enterprises (MWBE) participation, (based on the current availability of qualified MBEs and WBEs). The Fish Creek Pond Multi-Use Trail Project consists of the rehabilitation and asphalt resurfacing of approximately 3.0 miles of existing multi-use trail located within the Fish Creek Pond Campground. The project is intended to improve accessibility, enhance visitor safety, and encourage non-motorized recreational use by providing a durable and accessible trail surface separated from adjacent campground roadways. The rehabilitated trail will generally consist of an 8-foot-wide asphalt surface with 6 inches of compacted subbase and 1.5-foot-wide compacted gravel shoulders on each side. The trail will be constructed to maintain a maximum cross slope of 2 percent and a maximum running slope of 10 percent in accordance with applicable accessibility requirements. Estimated to be between $1,050,000 and $1,170,000 for General Construction. Furnish all labor, materials, equipment and supervision necessary for the construction of an approximately 3.25-mile, 8-foot wide asphalt multi-use trail. Work includes, but not limited to; clearing and grubbing, earthwork, underground utility location, subbase placement and compaction, asphalt placement, erosion and sediment controls, trail signage and pavement marking. This project involves furnishing all labor, materials, equipment and supervision necessary for the construction of an approximately 3.25-mile, 8-foot wide asphalt multi-use trail. *The value for this project is based on a financial range of $1,050,000 and $1,170,000. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
GC Bidding
Playgrounds / Parks / Athletic Fields
$1,170,000.00
Public - State/Provincial
New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 17, 2026
September 15, 2026
4523 State Route 30, Saranac Lake, NY
Related To This Project
Saranac Lake, NY
Bid Date: May 06 2026
Saranac Lake, NY
Bid Date: May 06 2026
Saranac Lake, NY
Bid Date: May 06 2026
Saranac Lake, NY
Bid Date: Jul 01 2026
Saranac Lake, NY
Bid Date: Jun 17 2026
Saranac Lake, NY
Bid Date: May 12 2026
Saranac Lake, NY
Bid Date: Jul 01 2019
Saranac Lake, NY
Bid Date: Mar 31 2026
Saranac Lake, NY
Bid Date: Jan 21 2026
Saranac Lake, NY
--
Saranac Lake, NY
Bid Date: Jan 07 2026
Saranac Lake, NY
Bid Date: Oct 30 2025
Saranac Lake, NY
Bid Date: Sep 22 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
