Published June 7, 2026 at 8:00 PM

Updated June 10, 2026

Site work and paving for a road / highway in Grand Haven, Michigan. Completed plans call for site work for a road / highway.

***As of May 29, 2026, the project was awarded to the following subcontractors : 42nd Avenue from Baldwin Street to Bauer Road resurfacing in Georgetown Township - $346,596.74 to Rieth Riley Grand Haven Township subdivision resurfacing - $981,712.88 to Rieth Riley Holland Township subdivision resurfacing - to $706,794.77 Rieth Riley Jamestown Township subdivision resurfacing - $117,669.70 to Black Gold Port Sheldon Township subdivision resurfacing - $53,807.90 to Black Gold Spring Lake Township subdivision resurfacing - $215,000.00 to Michigan Paving Zeeland Township subdivision resurfacing - $402,540.32 to Rieth Riley with a total amount of $2,477,525.57.*** Work on this project shall consist of 11.82 miles of HMA surfacing on streets in Georgetown, Grand Haven, Holland, Jamestown, Port Sheldon, Spring Lake, and Zeeland Townships in Ottawa County. Each bid must be submitted using either the hardcopy or online fillable version of the blank bid form, prepared in ink or by typing, in a sealed envelope, plainly marked as to the item being bid upon and the name of the bidder. The Road Commission reserves the right to reject any and all bids and award the contract in any manner to be in the best interest of the County of Ottawa. Project No. 495-005-260005: 0.99 miles of HMA cold milling, butt joints, trenching and HMA widening 4’ wide each side, adjustment of drainage structure covers, gate box adjust, milling around drainage structure covers, HMA resurfacing, HMA approaches, aggregate approaches, aggregate shoulders, slope restoration, and pavement markings on 42 nd Avenue from Baldwin Street to Bauer Road in Georgetown Township. Project No. 481-006-5549: 3.98 miles of concrete pavement removal, HMA cold milling, butt joints, adjustment of drainage structure covers, gate box adjust, milling around drainage structure covers, HMA resurfacing, HMA approaches, aggregate approaches, aggregate shoulders and slope restoration of Subdivision Streets in Grand Haven Township. Project No. 481-007-5552: 2.86 miles of concrete pavement removal, HMA cold milling, butt joints, adjustment of drainage structure covers, HBPW drainage structure adjust, gate box adjust, milling around drainage structure covers, HMA resurfacing, HMA approaches, aggregate approaches, aggregate shoulders and slope restoration of Subdivision Streets in Holland Township. Project No. 481-008-5548: 0.48 miles of HMA cold milling, adjustment of drainage structure covers, milling around drainage structure covers, HMA resurfacing, and slope restoration of Subdivision Streets in Jamestown Township. Project No. 481-012-5554: 0.40 miles of concrete pavement removal, HMA cold milling, butt joints, HMA resurfacing, HMA approaches, aggregate approaches, and slope restoration of Subdivision Streets in Port Sheldon Township. Project No. 481-014-5553: 1.06 miles of concrete pavement removal, HMA cold milling, butt joints, adjustment of drainage structure covers, gate box adjust, milling around drainage structure covers, HMA resurfacing, HMA approaches, aggregate approaches, and slope restoration of Subdivision Streets in Spring Lake Township. Project No. 481-017-5551: 2.05 miles of concrete pavement removal, HMA cold milling, butt joints, adjustment of drainage structure covers, gate box adjust, milling around drainage structure covers, HMA resurfacing, HMA approaches, aggregate approaches, aggregate shoulders and slope restoration of Subdivision Streets in Zeeland Township. Bid result - 42nd Avenue - Baldwin Street to Bauer Rd - Rieth Riley - 346,596.74 Grand Haven Township Subdivisions - Rieth Riley - 981,712.88 Holland Township Subdivisions - Rieth Riley - 706,794.77 Jamestown Township Subdivisions - Black Gold - 117,669.70 Port Sheldon Township Subdivisions - Black Gold - 53,807.90 Spring Lake Township Subdivisions - Michigan Paving - 215,000.00 Zeeland Township Subdivisions - Rieth Riley - 402,540.32

Award

Roads / Highways

$2,824,123.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
90
Active Projects
54
Bidding Soon
878
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 29, 2026

June 29, 2026

Project location map

Multiple Locations, Grand Haven, MI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.