BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 17, 2026 at 8:00 PM

Updated May 21, 2026

Site work for a water / sewer project in Largo, Florida. Conceptual plans call for site work for a water / sewer project.

The Venetian Gardens neighborhood has five (5) stormwater drainage systems each with a distinct outfall which drains the neighborhood to nearby Allens Creek. Persistent flooding backups occur after large storm events coupled with high tides or storm surge in the nearby creek. This condition will grow worse over time given climate change impacts. Further investigation into the Long Bow Lane drainage patterns to the north will be important information obtained during this project to determine what if any effect this area has on the Venetian Gardens drainage system as a whole. Additionally, there is corrugated metal pipe (CMP) in two of the drainage systems. CMP is at the end of its lifespan across the City. Should a segment of CMP fail in the immediate short-term future, localized neighborhood flooding would occur with any size storm event regardless of the creek’s flood stage. If this situation were to occur prior to an engineering study (preliminary engineering report), the failed pipe segment would likely have to be replaced twice, once as an emergency repair and a second time with the correct calculated diameter. The project scope proposed to resolve this situation is a two step multiphase project that includes: • Preliminary Engineering Report (PER) and Design Services - Includes stormwater modeling of the creek, asset condition assessments and collection system recommended improvements along with preliminary cost estimates. Design services would include the preferred alternative from the PER. The final drawing set could be broken into distinct drainage system packages for phased construction over a number of fiscal years. • Construction – Up to five phases, one for each drainage system, ranked first by the amount of corrugated metal pipe present then second by the number of homes protected. The project is included in the City's 2026-2030 Capital Improvement Program (CIP). As of April 18,2026, further details have not yet been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$7,990,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
280
Active Projects
129
Bidding Soon
2,059
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.