Published May 25, 2026 at 8:00 PM

Updated May 26, 2026

Site work and paving for a road / highway in Kaysville, Utah. Completed plans call for site work for a road / highway; and for paving for a road / highway.

https://www.standard.net/news/2026/apr/21/road-roundup-udot-offers-updates-on-sr-177-extension-other-ongoing-projects-in-weber-and-davis-counties/ Road roundup: UDOT offers updates on SR-177 extension, other ongoing projects in Weber and Davis counties By Rob Nielsen - | Apr 21, 2026 Rob Nielsen, Standard-Examiner The current end of SR-177 in West Point at the intersection of SR-193, pictured on Tuesday, April 21, 2026. Major construction on a 2.5 mile extension of SR-177 is set to begin this summer. Full-blown construction season is nearly upon the Wasatch Front and drivers will be seeing some major Utah Department of Transportation projects beginning, continuing and even wrapping up in 2026. One of the biggest projects to really get underway in 2026 will be the $225 million extension of SR-177 — the West Davis Corridor. UDOT Region 1 Senior Communication Manager Mitch Shaw told the Standard-Examiner in an email Tuesday that the project’s scope has grown somewhat from its environmental study nearly a decade ago. “UDOT is currently working on a project to extend SR-177 2.5 miles north to 1800 North in West Point and extend the Emigrant Trail from 1300 North to the Weber County line,” he said. “When the original West Davis environmental study was completed in 2017, it called for one lane in each direction in this area, because that’s what travel models suggested at the time. But with all the growth we’re seeing in Davis County, two lanes in each direction are now needed, which is what we will build with this extension. “The SR-177 extension project will include an interchange at SR-193 with on and off ramps. Bridges will be built for SR-177 over 300 North, 800 North and 1300 North, and the project will end at an at-grade intersection at 1800 North.” Photo supplied, Utah Department of Transportation Work progresses on the 1800 North interchange with I-15 near Hill Air Force Base in January 2026. He said drivers can expect heavy construction in the area this summer, including “land clearing, earthmoving, and heavy machinery, generally moving through the phases of site preparation, drainage installation, foundation laying, and paving.” Shaw said some items, such as utility relocations, were carried out last year, but the bulk of construction will commence this summer with the project scheduled to be completed in 2028. Shaw added that the next major step for the highway — crossing the Davis County border into Weber County — is also being explored, but he warned that it will be some time before there’s any such thing as a West Weber Corridor. “We are currently conducting a State Environmental Study to evaluate the extension of SR-177 from 1800 North in West Point to about 4000 South in West Haven, in Weber County,” he said. “The study is expected to last through late 2026. This extension is not funded and we do not currently have a construction timeline.” He noted that the corridor is ultimately the best way to help bring traffic relief to the area. “By 2050, the number of homes in western Davis and Weber counties will increase by 74%,” he said. “This growth is expected to substantially increase travel delays, even with all other planned projects. SR-177 will help address the growing population and meet future transportation needs.” While work gets underway on the northern end of SR-177, work continues on the 1800 North intersection with I-15 in Davis County. “This project is an effort to improve east/west mobility in northern Davis County by adding an interchange at 1800 North and I-15, widening 1800 North to 2000 West, and creating a new area where Hill Air Force Base can create an additional entrance gate in the future,” Shaw said. “The design includes seven lanes from I-15 to 250 West, five lanes from 250 West to 2000 West, and a new bridge over the rail crossing. We are more than a year into construction, with most of the work so far taking place off of I-15, just to the east near Hill Air Force Base.” He noted that much of the remaining work revolves around the interchange itself and utilities connected to the project. “Crews are installing new drinking water, storm water, and irrigation water lines for Clinton residents along 1800 North,” he said. “There are still major construction items remaining as well, which includes building the interchange itself, building the railroad bridge, widening 1800, paving, etc.” Shaw said project benefits include: “Meet the current and future traffic demands Accommodate and support all modes of transportation Provide a safe and efficient traveling experience for commuters of every kind In partnership with Sunset and Clinton, make improvements to local infrastructure to reduce disruption to the community” The project is anticipated to wrap up in November 2027 at a cost of around $385 million. Anticipated to wind up this year is a set of $361 million improvements to 5600 South in Roy and Riverdale. “We are in the fourth and final year of the project and it’s on schedule for completion by the end of this year,” Shaw said. “We’re currently installing signals, doing some of the final paving, installing fencing, installing curb and gutter and sidewalk, etc.” Shaw said benefits of the project include: “A new interchange Road widening on 5600 South Intersection improvements A new pedestrian bridge Local connectivity, multi-use path An extended trail system Utility upgrades Drainage improvements” He added this project will make the area much safer. “This project will reduce congestion and improve safety and mobility on 5600 S and I-15,” he said. ------------------------- Description : Rehabilitation High Volume This Project Requires Using the Electronic Certified Payroll Program. See Attachment to Notice to Contractors. This is a P+t (Price + Time) Project. The Department Will Not Hold Retention on This Project. Per Utah State Code 13-8-5 (1) Prime Contractors Cannot Hold Retention. Refer to Utah Code 13-8-5 (1) for More Information. Wage Rates: Apply Engineer's Estimate: Greater than $1.5M but less than or equal $3M The Right to Reject Any or All Bids is Reserved. As required, a contractor's license must be obtained from the Utah Department of Commerce to work on UDOT projects as defined from the Division of Professional Licensing. Project Plans Cannot Be Downloaded or Printed From the Website Unless Your Company is Registered With Udot. Go to Udot's Website to Register. UTDOT - Rehabilitation High Volume (I-15; SR-232 to SR-103)

Award

Roads / Highways

$2,144,223.00

Public - State/Provincial

Paving, Site Work

63

5

6

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
194
Active Projects
120
Bidding Soon
1,350
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 14, 2026

July 13, 2026

Project location map

I-15, Kaysville, UT


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.