Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 13, 2026 at 8:00 PM
Updated May 16, 2026
Site work and paving for a mixed-use development in Glenwood Springs, Colorado. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
Reference Number 0000421265 Source ID PU.AG.USA.2106435.C12722101 Piggyback Contract No Question Deadline 05/05/2026 at 5:00 PM MT Questions are submitted online No Questions must be submitted to bidresponse@cogs.us The goal of this project is to create continuous pedestrian access between Glenwood Springs Middle School and Highway 6 & 24 by installing a new 8 foot sidewalk with curb and gutter, improve drainage in the ditch that borders the south side of the Middle School property, replace the ditch on the east side of Sister Lucy Downey Park with storm pipe, reconstruct the roadway from Highway 6 & 24 to the Middle School entrance, and improve the remaining portion of Soccer Field Road up to Donegan with new asphalt mill and overlay per the design documents in the RFP. Additionally, Alternative 2 for this project will be to do roadway improvements on 9th Street from Bennett to Garfield. Bennett to Palmer is to be mill & overlay only while Palmer to Garfield is a full depth reconstruction with new base course and 4" of asphalt. All work is to be performed in accordance with the "State Department of Highways - Division of Highways - State of Colorado - Standard Specifications for Road and Bridge Construction", latest edition and City of Glenwood Springs Design Standards. General Requirements - Contractors License Required - FOB Destination - Insurance Required - Warranty Information Required
Post-Bid
Roads / Highways
$600,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 13, 2026
June 4, 2026
Soccer Field Rd, Glenwood Springs, CO
Related To This Project
Glenwood Springs, CO
Bid Date: Jun 10 2026
Glenwood Springs, CO
--
Glenwood Springs, CO
Bid Date: May 06 2026
Glenwood Springs, CO
Bid Date: Jun 04 2026
Glenwood Springs, CO
--
Glenwood Springs, CO
Bid Date: Apr 30 2026
Glenwood Springs, CO
Bid Date: Mar 23 2026
Glenwood Springs, CO
Bid Date: Mar 24 2026
Glenwood Springs, CO
Bid Date: Mar 26 2026
Glenwood Springs, CO
Bid Date: Feb 26 2026
Glenwood Springs, CO
Bid Date: Mar 12 2026
Glenwood Springs, CO
Bid Date: Feb 26 2026
Glenwood Springs, CO
Bid Date: Mar 04 2026
Glenwood Springs, CO
--
Glenwood Springs, CO
Bid Date: Mar 09 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
