BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 29, 2026 at 8:00 PM

Updated May 16, 2026

Site work and new construction of an educational facility in Everett, Washington. Completed plans call for the construction of a educational facility; and for site work for a educational facility.

Proposals, including statements of qualifications, are requested from capable General Contractor/Construction Manager (GC/CM) firms or teams for the development and construction of Explorer Middle School Phase 2 at Explorer Middle School in the City of Everett. The contract will be awarded through a competitive negotiation process. Preconstruction services are fully funded, with construction contingent upon the passing of a bond. Construction will be substantially completed in Fall 2030. Question Deadline 05/05/2026 at 2:00 PM PT All information shall be submitted at the dates and times indicated herein to: Location: Mukilteo School District Shelly Henderson, Director of Capital Projects District Support Services Center 8925 Airport Road Everett, WA 98204 Email: hendersonsa@mukilteo.wednet.edu Telephone: 425.356.1229 Explorer Middle School was opened in 1973 as an open concept Kindergarten through eighth grade school. It has undergone minor upgrades to this point. Phase 1 of the entire school replacement was approved by voters as part of the 2020 bond package. The new athletics building was completed in Fall 2025 and House 4 was partially demolished. Phase 2 will complete the school replacement in sub-phases, Phase 2A and 2B, to ensure the school can remain operational during construction. Explorer Middle School Phase 2 will be approximately 120,700 square feet of new buildings, demolition of House 2 and 4, new parking and bus loop, playfields/courts, and associated site infrastructure. Anticipated start is Summer 2027 with completion of Phase 2B in Fall of 2030. The new building will include general classrooms, art classrooms, science classrooms, CTE classrooms, administrative spaces, library, kitchen, cafeteria and support spaces.

Post-Bid

Educational

$80,600,000.00

Public - County

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
230
Active Projects
98
Bidding Soon
1,344
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 12, 2026

July 13, 2026

Project location map

9600 Sharon Dr, Everett, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.