BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 26, 2026 at 8:00 PM

Updated May 16, 2026

Site work and paving for a road / highway in Rhinelander, Wisconsin. Completed plans call for site work for a road / highway.

Pulverizing, Shaping, And Paving - Oneida County Highway E - The Oneida County Highway Department will be accepting bids for pulverizing, shaping, and paving approximately 2.1 miles of road on County Highway 'E' in Oneida County. Specifications can be obtained by contacting the Oneida County Highway Department. Sealed bids will be accepted at the Oneida County Highway Department, at which time they will be opened and publicly read. Oneida County reserves the right to accept or reject any and or all bids, or accept the bid deemed most advantageous to the Department. It is anticipated that the work to be done shall be completed by August 31st, 2026 Question Deadline 04/28/2026 Every request for such interpretation should be in writing addressed to Ben Rich at brich@oneidacountywig.gov and, to be given consideration, must be received at least seven days prior to the date fixed for the opening of bids. Scope of Work. The work under this contract consists of milling, pulverizing, grading and compaction of existing asphaltic pavement, final grading and compacting of stabilized roadway, and supplying and laying approximately 6,100 tons of Super pave HMA PG 58-28 on Oneida County Highway E. This work begins at the intersection of CTH D and ends near the intersection of Frederick Drive, approximately 2.1 miles (See the map of approximate location at the end of this Section) From CTH D north approximately 1850', on top of Rainbow Dam, contractor will mill existing asphalt to base course. Millings will be loaded into county trucks to haul away. North of the Rainbow Dam earthen embankment, contractor will pulverize existing pavement full width and depth. The work shall be executed under the requirements of the State of Wisconsin, Department of Transportation, Standard Specifications for Road and Bridge Construction, Edition of 2020 and the special provision specifications attached.

Post-Bid

Roads / Highways

$750,000.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
74
Active Projects
36
Bidding Soon
303
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 5, 2026

June 4, 2026

Project location map

Multiple Locations, Rhinelander, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.