BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 14, 2026 at 8:00 PM

Updated May 15, 2026

Site work for a civil project in Castle Pines, Colorado. Completed plans call for site work for a water / sewer project.

The District operates a five (5) MGD direct filtration water treatment plant and stores treated water in two circular buried tank structures collocated at The Country Club at Castle Pines. Tank #1 is 2-MG and was constructed in the mid-1980s, Tank #2 is 1.5-MG and was constructed in the mid-2000s. Kennedy Jenks assessed both tanks in 2024 and provided recommendations including: repair of exposed wall ties, repair of column cracks and honeycombing, repair of floor cracks, replacement of a failed membrane system at Tank #1, repair of exposed coarse aggregate in walls, repair or replacement of corroded metal equipment (valves, overflow box, stairs), and application of a new coatings system. The South Tanks Rehabilitation Program will implement these rehabilitation recommendations and additional upgrades: demolition and replacement of the existing 4-foot diameter by 24-foot-deep valve vault with a 12.5 x 7-foot rectangular valve vault and associated upgrades, installation of a new sump pump in the valve vault, demolition and replacement of 18-inch, 8-inch, and 6-inch piping and appurtenances around the valve vault including 18-inch and 8-inch butterfly valves, installation of new access hatches at Tank #1 to match Tank #2, installation of a new level transmitter for Tank #1, installation of electrical upgrades to solar power at Tank #2, installation of a new float switch for backup level measurement at Tank #2, and design for abandonment of the 8-inch water main east of the existing valve vault. During pre-construction, support is required for identification and securing of permits, licenses, and inspections including confined space entry, pipeline condition assessment and locating at South Tank #1, design of potential shoring system for the new valve vault, design support with final tank repairs and interior coatings, collection of quantities for tank repairs, 60% and 90% design constructability reviews, cost model development, and development of a Guaranteed Maximum Price (GMP) Proposal. Question Deadline 05/05/2026 at 4:00 PM MT Submit questions to the established points of contact: Laura Tejera, LauraTejera@kennedyjenks.com Marisol Alvarez, MarisolAlvarez@kennedyjenks.com

GC Bidding

Water / Sewer

$5,000,000.00

Public - City

Site Work

73

7

2

4

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 18, 2026

January 1, 2027

Project location map

Multiple Locations, Castle Pines, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.