BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 11, 2026 at 8:00 PM

Updated May 15, 2026

Site work and environmental remediation for a playground / park / athletic field in Mount Washington, New Hampshire. Completed plans call for site work for a playground / park / athletic field; and for environmental remediation for a playground / park / athletic field.

This project supports the Mount Washington Master Plan requirement for an independent third-party environmental assessment, including soil and groundwater investigations. The selected contractor will be responsible for all work related to soil and groundwater contamination sampling at Mount Washington State Park. The work must meet all applicable regulatory standards, including NHDES Env-Or 600/610, PFAS soil requirements, and EPA Region 1 QAPP and QA/R-5 standards. Vendor Questions Due: May 13, 2026, Email: albdios.v.fioravantedncr.nh.gov Scope of Services: The Contractor shall perform comprehensive soil and groundwater contamination sampling at Mount Washington State Park. This work supports the Master Plan requirement for an independent third-party environmental assessment. Services include development of a detailed Sampling & Analysis Plan (SAP), a full EPA Region 1-compliant QAPP, and all field and laboratory tasks. Field activities shall include soil borings, collection of discrete and composite soil samples, installation and development of temporary groundwater wells, and collection of groundwater samples following Env-Or 610.02. Analytical work shall encompass VOCs, SVOCs, PAHs, TPH, metals, and PFAS (EPA 1633). The Contractor shall also perform full data validation, prepare a Data Usability Summary Report (DUSR), and provide Draft and Final reports including figures, tables, boring logs, well construction details, laboratory reports, and electronic data deliverables (EDD). o Contractor shall comply with NHDES Env-Or 600, Env-Or 610, PFAS soil standards, EPA Region 1 QAPP requirements, EPA QA/R-5, and all other referenced environmental regulations. o Prepare a Sampling & Analysis Plan (SAP) and full QAPP. o Conduct soil sampling near building perimeters, tank areas, infrastructure, historic-use zones, and areas of suspected contamination. o Install temporary groundwater wells, develop and purge according to Env-Or 610.02. o Perform analysis for VOCs, SVOCs, PAHs, TPH, Metals, PFAS. o Perform data validation, prepare DUSR, and submit Draft and Final Reports

Sub-Bidding

Playgrounds / Parks / Athletic Fields

$500,000.00

Public - State/Provincial

Environmental Remediation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
109
Active Projects
55
Bidding Soon
662
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 15, 2026

June 30, 2026

Project location map

To Be Determined, Mount Washington, NH


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.