BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 9, 2026 at 8:00 PM

Updated June 10, 2026

Site work for a water / sewer project in Franklin, New Hampshire. Completed plans call for site work for a water / sewer project.

The work consists of furnishing all equipment, materials, and labor required to remove and replace multiple components of the lower sheave block assembly and the entire length of wire rope associated with the 70-ton Philips and Davies gate hoist for Service Gate #1. The contractor shall supply and install new lower sheave block components and new wire rope in accordance with the Statement of Work, project specifications, and applicable ASME B30 standards for load-handling equipment of this type and configuration. All work shall be performed to ensure proper operation, safety, and compliance with required standards for the gate hoist system. Location: Franklin Falls Dam, 1129 Lake Avenue, Franklin, NH 03235. The magnitude of construction is between $200,000 and $350,000. For additional information on construction contracts awarded to small businesses please visit: Partnering With Us (army.mil). *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Water / Sewer

$350,000.00

Public - Federal

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
426
Active Projects
261
Bidding Soon
3,065
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 4, 2026

July 6, 2026

Project location map

Lake Ave, Franklin, NH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.