Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 8, 2026 at 8:00 PM
Updated May 15, 2026
Site work for a museum in Fort Smith, Arkansas. Working plans call for site work for a museum.
Work includes the replacement of two commercial backflow prevention assemblies and the installation of heated enclosures to provide freeze protection. The contractor shall furnish all labor, materials, equipment, and coordination necessary to remove existing assemblies and install new backflow preventers in accordance with applicable codes and standards. Work is anticipated to begin in Summer 2026 and will be performed as a construction effort consistent with the stated magnitude of construction. Location: Fort Smith National Historic Site, 301 Parker Avenue, Fort Smith, AR 72901. The Magnitude of Construction anticipated is between $100,000 and $250,000. The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Final Planning
Museum
$250,000.00
Public - Federal
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 20, 2026
301 Parker Ave, Fort Smith, AR
Related To This Project
Fort Smith, AR
Bid Date: May 08 2026
Fort Smith, AR
Bid Date: Apr 23 2026
Fort Smith, AR
Bid Date: May 28 2026
Fort Smith, AR
Bid Date: May 18 2026
Fort Smith, AR
Bid Date: May 14 2026
Fort Smith, AR
Bid Date: May 14 2026
Fort Smith, AR
Bid Date: May 14 2026
Fort Smith, AR
Bid Date: May 14 2026
Fort Smith, AR
Bid Date: Apr 14 2026
Fort Smith, AR
Bid Date: Mar 31 2026
Fort Smith, AR
--
Fort Smith, AR
Bid Date: Mar 10 2026
Fort Smith, AR
Bid Date: Mar 12 2026
Fort Smith, AR
Bid Date: Feb 17 2026
Fort Smith, AR
Bid Date: Feb 17 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
