Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 4, 2026 at 8:00 PM
Updated May 20, 2026
Site work for a water / sewer project in Onalaska, Wisconsin. Working plans call for site work for a water / sewer project.
As of 5/4/2026, The City has withdrawn this bid and will be rebidding the project. Water main work includes 700 linear feet of 6-inch ductile iron pipe water main, two hydrants, five gate valves, and one set of corporation valves, curb stops and boxes, and copper water services. Sanitary sewer work includes 1,400 linear feet of 8-inch SDR 35, four 48-inch diameter sanitary manholes and four SDR 35 laterals. Storm sewer work includes 630 linear feet of 18-inch class V reinforced concrete pipe, 130 linear feet of 12-inch class V reinforced concrete pipe, six 2'x3' inlets, and three 48-inch diameter storm manholes. Pavement, crushed aggregate, and miscellaneous work includes 1,492 tons of 2.5-inch asphalt pavement, 3,710 tons of crushed aggregate base course, 2,500 linear feet of curb and gutter, 300 cubic yards of black dirt, 2,780 square yards of seed, fertilizer, and mulch, concrete sidewalk/driveway apron, and asphalt driveway, excavation, traffic removals, and control, plus additional miscellaneous appurtenances. Work is to be performed in accordance with the plans and specifications on file. Sealed bids only will be received. Each bid must be accompanied by a Certificate of Organization and Authority, a list of subcontractors, approval of pre-qualification, and a certified check or bid bond equal to at least 5% and not more than 10% of the bid. Bidders must file a Proof of Responsibility form showing sufficient financial ability, equipment, and experience. Bids will be accepted only from qualified bidders. All relevant documents and ordinances are part of the contract. Bidders must be aware of and required to pay minimum wage rates as established by the City. The time for commencement of the work shall begin no later than ten days after written notification from the engineer unless otherwise stipulated, and completion is to be no later than October 23, 2026. The envelope containing the proposal must be marked appropriately.
Final Planning
Water / Sewer
$2,000,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 12, 2026
November 4, 2026
To be determined, Onalaska, WI
Related To This Project
Onalaska, WI
Bid Date: Apr 28 2026
Onalaska, WI
--
Onalaska, WI
--
Onalaska, WI
Bid Date: Apr 09 2026
Onalaska, WI
Bid Date: Apr 16 2026
Onalaska, WI
Bid Date: Apr 07 2026
Onalaska, WI
Bid Date: Mar 03 2026
Onalaska, WI
Bid Date: Mar 03 2026
Onalaska, WI
Bid Date: Mar 03 2026
Onalaska, WI
Bid Date: Feb 10 2026
Onalaska, WI
Bid Date: Feb 03 2026
Onalaska, WI
Bid Date: Dec 30 2025
Onalaska, WI
Bid Date: Jan 13 2026
Onalaska, WI
Bid Date: Sep 02 2025
Onalaska, WI
Bid Date: Aug 06 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
