BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 9, 2026 at 8:00 PM

Updated May 16, 2026

Site work, paving and outdoor lighting for a mixed-use development in Stevens Point, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and for outdoor lighting for a sidewalk / parking lot.

The work under this contract shall consist of full reconstruction including concrete pavement, curb and gutter, and sidewalk; replacing existing signing and pavement markings; upgrading traffic signal equipment; roundabout construction; and retaining wall construction. Additionally, the project includes replacing and upgrading storm sewer, sanitary sewer, water main, and street lighting, along with all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract. Contract documents indicate all questions must be submitted 10 days prior to bid opening. Due to the short bid window, questions have been answered well past that date, Questions may not be answered if submitted after 10:00 AM May 6th. Questions must be submitted to AECOM Design Engineer or to DPW@stevenspoint.com. Questions submitted direct to City staff through personal email addresses, via direct phone calls or direct text messaging will not be answered

Bid Results

Roads / Highways

$15,167,497.00

Public - City

Outdoor Lighting, Paving, Site Work

667

28

6

4

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
122
Active Projects
72
Bidding Soon
674
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 7, 2026

June 8, 2026

Project location map

US-51, Stevens Point, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.