BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 18, 2026 at 8:00 PM

Updated May 19, 2026

Site work for a water / sewer project in Weston, West Virginia. Completed plans call for site work for a water / sewer project.

Sealed bids are requested for the Weston Sanitary Board Sludge Dewatering Project - Phase 2. The work includes construction at the wastewater treatment plant of a complete sewage sludge dewatering system, installation of sludge transfer pumps, construction of sludge drying beds, installation of a polymer injection system, site development, excavation, all necessary piping and fittings as described in the plans and specifications. There are three additive alternates: a third sludge drying bed, a second sludge transfer pump, and greenhouse garage door electric operators. The contract time is 365 days for substantial completion and 400 days for final completion, with liquidated damages of $750 per day after the time limit for substantial completion. Bidders must submit bids using a two-envelope system: one envelope for required bidder information and another for the bid form. Both must be clearly labeled. Bids must be accompanied by a certified check or bid bond for at least 5% of the base bid. Bidders may not withdraw bids for 90 days after opening. Bidders are required to have a West Virginia Contractor's License and comply with various federal and state requirements, including the Davis Bacon Act, Disadvantaged Business Enterprise participation, American Iron and Steel requirements, and non-discrimination laws. The right to reject any and all bids is reserved. Bidders must not be debarred or suspended as listed on the System for Award Management (SAM). Minority firms are encouraged to participate. Bidders are required to comply with all laws pertaining to federal wage rates, and must make good faith efforts to subcontract a portion of the contract to Disadvantaged Business Enterprises as per federal regulation. Construction time limit for the Contract is 365 consecutive calendar days to substantial completion for Base Bid work, and 400 days for final completion. Question Deadline 05/21/2026 All questions about the meaning or intent of the Bidding Documents are to be submitted toEngineer in writing

GC Bidding

Water / Sewer

$3,000,000.00

Public - City

Site Work

27

21

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
147
Active Projects
84
Bidding Soon
623
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 28, 2026

July 27, 2026

Project location map

To Be Determined, Weston, WV

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.