BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 13, 2026 at 8:00 PM

Updated May 15, 2026

Renovation of an office development in College Park, Georgia. Completed plans call for the renovation of a office development.

Reference Number 0000421972 Source ID PU.AG.USA.2579352.C21616351 Piggyback Contract No The City of college park is looking for qualified vendors to renovate the Engineering Department office space. Question Acceptance Deadline : 05/01/2026 03:00 PM EDT Questions are submitted online Yes General Requirements - Contractors License Required - Insurance Required SCOPE of SERVICE Demolition & Removal The contractor shall provide all labor, tools, and equipment necessary to complete the following: Remove and dispose of existing carpet throughout designated areas. Remove existing cubicle workstations Remove existing furniture Remove existing shelving; salvage and coordinate for reuse and relocation. Remove existing woodwork counters and counter supports. Remove existing wall base. Remove existing plotter; coordinate for salvage, reuse, and relocation. Protect existing door frames and hardware to remain in place. Protect existing acoustic ceiling tile and grid system to remain. Repairs & Surface Preparation Patch and repair any damaged gypsum wallboard (drywall) to a smooth, paint-ready finish. Prepare all surfaces for new finishes, including cleaning, sanding, and priming as required. Installation & Finishes Install new carpet flooring in all designated areas. Install new wall base to match existing facility standards. Paint existing door frames with new finish. Paint all existing partitions/walls with new finish. Verify protection of existing HVAC systems; adjust diffusers if required for new layout. Coordinate with IT staff for any relocation of data/telecom outlets if impacted. Ensure all electrical systems remain operational; modify outlets if needed to support new layout. Maintain compliance with all applicable codes and standards. Site Protection & Safety Protect adjacent occupied areas from dust, debris, and noise. Maintain safe access for building occupants during construction. Follow all OSHA and local government safety requirements. Provide daily cleanup and final debris removal. Compliance & Standards All work shall comply with: Local building codes and regulations ADA (accessibility) requirements Fire and life safety codes Local government facility standards Project Closeout Final walkthrough with Facility Manager. Completion of punch list items. Delivery of any warranties for materials and workmanship. Ensure all salvaged items are properly reinstalled or turned over.

GC Bidding

Office

$200,000.00

Public - City

Renovation

5

10

13

5

Subscribe For Documents

117 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
203
Active Projects
90
Bidding Soon
1,423
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 15, 2026

June 15, 2026

Project location map

3667 Main St, College Park, GA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.