BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 6, 2026 at 8:00 PM

Updated May 16, 2026

Site work for a water / sewer project in Milwaukee, Wisconsin. Completed plans call for site work for a water / sewer project.

Sealed bids are requested for water main relays at specified locations. The contractor must furnish and install approximately 7,356 linear feet of ductile iron pipe in various sizes. The City will provide miscellaneous materials as shown on plans and proposal forms. The contractor must start work immediately after contract execution and complete specific projects by set deadlines, using multiple crews as needed. The project requires 40% of all hours worked to be by residents, with one quarter of these hours by residents from listed zip codes. The SBE requirement is 25% of the contract base bid, with the SBE Compliance Plan (Form A) and SBE certificates to be submitted with the bid. There is an apprenticeship requirement for one construction craft laborer, with specific apprentice hour distributions if the contract is awarded at $500,000 or higher. Bid security of 10% of the contractor's base bid is required, submitted as bond, certified check, cashier's check, or cash. Proper completion of SBE, residency, and apprenticeship forms is required; incomplete forms will cause rejection of the bid. Contractors awarded contracts of $25,000 or more must participate in training on the City's B2GNow contract compliance software and provide timely subcontractor payment updates. The prime contractor must also use the City's Labor Compliance Reporting software for payroll monitoring. All provisions of the City of Milwaukee General Official Notice to Contractors must be followed. Bid documents are available electronically, and submission is encouraged through the designated online platform. Relevant addenda and responses will be posted online. Questions about SBE firms or compliance can be directed to the Office of Equity and Inclusion.

Bid Results

Water / Sewer

$2,176,722.00

Public - City

Site Work

17

3

2

4

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
360
Active Projects
187
Bidding Soon
2,160
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 5, 2026

June 19, 2026

Project location map

To be determined, Milwaukee, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.