Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 14, 2026 at 8:00 PM
Updated May 15, 2026
Site work for a water / sewer project in Blaine, Washington. Completed plans call for site work for a water / sewer project.
Principal items of the project are: Schedules A, B, and C include installation of approximately 800 lineal feet of 6-inch ductile iron water main, approximately 1,075 lineal feet of 8-inch ductile iron water main and 100 lineal feet of 2-inch water main, water main appurtenances, three connections to existing water main, as well as road and private improvements restoration and related work. Existing water main to be abandoned shall be decommissioned, filled, and capped as part of the project. Schedules A, B, and C consist of planned improvements independent of each other at three different sites. Schedule D includes replacement of twenty existing fire hydrants and connecting to an existing foot valve, graded fire hydrant accesses, and installation of water system appurtenances in the locations listed. The estimated cost of construction, not including applicable taxes, is approximately $942,000 The Project Manager is Rodney Langer, email Rodney.Langer@deainc.com. Each bid shall be in accordance with the Project Manual which includes Specifications, Contract Drawings, and other Contractor Documents. Access to project bid documents is provided free of charge to Prime Bidders, Subcontractors, and Vendors through www.bxwa.com. Bidders are recommended to register online to receive automatic notifications of future addenda. Bidders that do not register will need to periodically check the online plan room for addenda issued for this project. Bidders and/or contractors are notified to examine thoroughly the bid instructions, proposals, the form of Contract, Drawings, and Specifications. If there is any doubt or obscurity as to their meaning, bidders or contractors should ask the Engineers for clarification before submitting their proposal or accepting their Contract. Each bid shall be accompanied by a Bid Bond, Cashier's Check, or Certified Check, made payable to the Birch Bay Water and Sewer District Treasurer as indicated in the Instructions for Bidders. The three lowest bids may not be withdrawn for 60 days after the bid opening. The Owner reserves the right to reject any and all bids or waive any informalities in the bidding process.
Post-Bid
Water / Sewer
$942,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 14, 2026
June 15, 2026
Multiple Locations, Blaine, WA
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
