BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 4, 2026 at 8:00 PM

Updated June 5, 2026

Site work and paving for a sidewalk / parking lot in Blaine, Washington. Conceptual plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The City of Blaine ("City") is seeking a statement of qualifications from firms interested in providing professional services for the pedestrian safety improvement projects: Blaine Multimodal Improvements , and Blaine Peace Portal Community Trail - Phase 3 Project 1: Blaine Multimodal Improvements Blaine is focusing on growth and development in and around the downtown area and the central school campus. This infill growth strategy is focused on reducing vehicle miles traveled and greenhouse gas emissions, and providing opportunities for walking, biking, and rolling for both residents and visitors. Currently, there is a significant gap in the sidewalk along the west side of SR 548 (Peace Portal Drive) in the south portion of downtown Blaine, and there are no ADA-compliant flashing crosswalks to support safe walk routes between residential neighborhoods and the Blaine Elementary, Middle, and High Schools. WTA transit stops for Route 75 are provided on both sides of many streets along the route through downtown Blaine, but are not supported by ADA-compliant flashing crosswalks to help transit riders cross the street safely and comfortably. Existing conditions may prevent both school children and WTA transit riders from walking to their destinations. This project will eliminate the sidewalk gap along SR 548 Peace Portal Drive from Clark Street to Boblett Street by constructing 161 linear feet of ADA-compliant, 8-foot-wide concrete sidewalk to fill the gap and will upgrade the ADA ramps at the mid-block crossing to complete the continuous walking and rolling route along and across SR 548 in downtown Blaine. and will install five flashing crosswalks at five intersections surrounding the central campus for all Blaine schools. Project 2: Blaine Peace Portal Community Trail The Peace Portal Community Trail has been constructed in multiple phases from downtown Blaine to its current terminus at Hughes Avenue, and additional planned phases to the southern City limit at West Road are adopted in both the Transportation Element of the Blaine Comprehensive Plan and the City of Blaine 2026-2031 Six-Year Transportation Improvement Program. Phase 3 of the Peace Portal Community Trail will extend the paved 10-foot-wide multiuse pathway 1,800 linear feet to the southeast to the City of Blaine welcome sign at the intersection of Bell Road and Peace Portal Disadvantaged, minority, and women-owned consultant firms are encouraged to respond. After considering the submittals, the City will negotiate final terms with the selected party. The City of Blaine reserves the right to cancel this request or reject any and all responses submitted if the City's best interest would be served. Inquiries regarding this Request for Qualification should be directed to Manroop Kaur, Public Works Director, via email mkaur@cityofblaine.com. The method of Contractor Selection has not been Determined at this time.

Conceptual

Sidewalks / Parking Lot

$5,000,000.00

Public - City

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
300
Active Projects
125
Bidding Soon
2,438
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 11, 2027

Project location map

Multiple Locations, Blaine, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.