BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 7, 2026 at 8:00 PM

Updated May 16, 2026

Demolition, site work and renovation of a development in Portland, Oregon. Completed plans call for the demolition of a development; for the renovation of a development; and for site work for a development.

Description of Work Provide all labor, materials, equipment, and supervision to replace the existing entry gate system and complete associated site improvements. Refer to attached plan set for full details. Work includes: o All required permits, approvals, inspections, and related fees. o Selective demolition of existing gate, fencing, and associated electrical components. o Minor earthwork, trenching, grading, and restoration of disturbed areas. o Furnish and install new fencing and vehicular gate, including all hardware and security features. o Electrical work including power, conduit, wiring, grounding, and control systems. o Data cabling and CAT 6 work o Coordination with Owner's technology vendor for installation of gate operator, controls, and safety devices. o Coordination with Owner's existing access systems including Nokbox for police and fire access. o Installation of bollards and site protection elements. o Testing, commissioning, and startup of a complete, operational system. o Closeout including as-builts, O&M manuals, and site cleanup. Provide all labor, materials, equipment, and supervision to replace the existing entry gate system and complete associated site improvements. If the Contractor believes that the Work to be done or any of the matters relative to the Contract Documents are not sufficiently detailed or explained in the Contract Documents, or if the Contractor has any questions as to the meaning or intent of the Contract Documents, Contractor shall immediately submit to Architect, Engineer, and Metro a written Request for Information ("RFI") that shall fully describe the information sought. 3.3.1 The RFI shall be directed to the Project Manager and Architect. Subcontractors shall direct correspondence through the Contractor to the Project Manager and Architect. At a minimum the RFI shall contain: (1) project title, (2) identify the nature and location of each clarification/verification, (3) date, (4) response by and RFI number, (5) subject, (6) initiator of the question, (7) indication of the costs, (8) Contract drawings reference, (9) Contract Specification section, and (10) descriptive text and space for a reply. Each RFI shall be numbered sequentially beginning with #001, and a separate RFI shall be submitted for each item. Verbal discussions/clarifications for minor items can be addressed with the Architect by phone and the Contractor shall follow up with a confirming RFI.

GC Bidding

Conservation and Development

$1,500,000.00

Public - County

Demolition, Renovation, Site Work

7

14

2

2

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
197
Active Projects
95
Bidding Soon
920
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 20, 2026

June 1, 2026

Project location map

9387 N Columbia Blvd, Portland, OR

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.