Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 1, 2026 at 8:00 PM
Updated May 20, 2026
Site work and renovation of a military facility in Flagstaff, Arizona. Working plans call for the renovation of a military facility; and for site work for a military facility.
Furnish all labor, supervision, materials, licenses, permits, insurance, transportation, and equipment necessary to perform construction and demolition activities at an existing communications site. Work includes construction of a Government-Furnished Equipment communication tower and associated foundations, construction of a Government-Furnished Equipment wave guide bridge and foundations, installation of a Government-Furnished Equipment Unity Power Battery Backup System, and provision of a new 1,000-gallon propane tank with supply line. The scope also includes construction of new foundations, construction of a generator building and foundation, and furnishing and installation of a specified generator. Additional work consists of temporary relocation of boulders to facilitate construction activities, removal of foundations for the existing propane tank, transfer of existing propane from the existing tank to the new tank, and removal of the existing communications tower and its foundation to four feet below grade. Interior remodeling of the communications building is required, along with removal and replacement of existing exterior metal platforms and stairs. The contractor shall remove and dispose of asbestos-containing floor tiles in accordance with applicable requirements. Final site restoration includes relocation of boulders to attain a natural appearance after construction. The contractor shall remove and dispose of existing communications site materials in accordance with the construction contract, applicable contract clauses, Western Area Power Administration Construction Standards, standard drawings, and the project specifications and drawings. All work shall be performed in strict compliance with the project specifications and drawings. The project magnitude is estimated between $750,000 and $1,000,000. The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Final Planning
Military
$1,000,000.00
Public - Federal
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 14, 2026
To Be Determined, Flagstaff, AZ
Related To This Project
Flagstaff, AZ
--
Flagstaff, AZ
Bid Date: Jun 18 2026
Flagstaff, AZ
--
Flagstaff, AZ
Bid Date: May 26 2026
Flagstaff, AZ
--
Flagstaff, AZ
Bid Date: May 29 2026
Flagstaff, AZ
Bid Date: May 21 2026
Flagstaff, AZ
Bid Date: Jun 12 2026
Flagstaff, AZ
Bid Date: Jun 17 2026
Flagstaff, AZ
Bid Date: May 06 2026
Flagstaff, AZ
Bid Date: Apr 29 2026
Flagstaff, AZ
Bid Date: Apr 16 2026
Flagstaff, AZ
--
Flagstaff, AZ
Bid Date: Jun 03 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
