Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 4, 2026 at 8:00 PM
Updated May 21, 2026
This is a service / maintenance or supply contract in Savanna, Illinois. Contact the soliciting agency for additional information.
The Complexity Factor for this project is 0.07. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on July 28, 2026, at 10:00 AM at the Region Two/District Two Office in Dixon. Phase I and II engineering services are required for the roadway reconstruction of IL 84 from the Mississippi Palisades State Park main entrance to approximately 0.2 Mi. N. of US 52 (W). This project was previously advertised as part of a larger project on PTB 158, and a significant amount of the work was completed; however, due to budget constraints and other district priorities, the project was placed on hold. Due to these reasons, the project will require a re-evaluation of the Phase I Report, anticipated to be a Federal Categorical Exclusion, preparation of contract plans, Type, Size and Location (TSL), retaining wall design, Bluff stability, Structural Geotechnical Reports (SGR), hydraulic analyses, geometric modifications, coordination with the railroad, local agencies, 4F coordination with Palisades State Park and potential structures, Wetland Impact Evaluation, PESA Response, T&E Impact Evaluations, Traffic Management Assessment (TMA), substantial boring/drilling effort, public involvement activities, accommodate for bicycle and pedestrian facilities, identifying utility conflicts and any other activities related to Phase I and II. The Prime firm must be prequalified in the following categories to be considered for this project: Highways (Roads and Streets) Location Design Studies (Reconstruction/Major Rehabilitation) Structures (Highway: Advanced Typical) Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The method of contractor selection has not been determined at this time. ILDOT - 23 - RFQ - Reconstruction of IL 84 from Mississippi Palisades State Park Main Entrance to N. of US 52 (W), Phase I/II Engineering Services
Conceptual
Bridges / Tunnels
$67,600,000.00
Public - State/Provincial
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 23, 2026
IL-84, Savanna, IL
Related To This Project
Savanna, IL
Bid Date: Oct 13 2025
Savanna, IL
Bid Date: Feb 27 2026
Savanna, IL
Bid Date: May 19 2025
Savanna, IL
Bid Date: Apr 22 2025
Savanna, IL
Bid Date: May 16 2025
Savanna, IL
Bid Date: Apr 22 2025
Savanna, IL
Bid Date: Mar 26 2025
Savanna, IL
Bid Date: Apr 09 2025
Savanna, IL
Bid Date: Aug 01 2024
Savanna, IL
Bid Date: Jun 21 2024
Savanna, IL
Bid Date: Jun 21 2024
Savanna, IL
Bid Date: Oct 13 2023
Savanna, IL
Bid Date: Sep 22 2023
Savanna, IL
Bid Date: Jan 21 2022
Savanna, IL
Bid Date: Nov 10 2021
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
