BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 4, 2026 at 8:00 PM

Updated May 21, 2026

Site work and paving for a civil project in Dixon, Illinois. Conceptual plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; and bridge / tunnel.

The Complexity Factor for this project is 0. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on August 5, 2026, at 10:30 AM at the Region Two/District Two Office in Dixon. Phase I/II engineering services are required for various projects in District Two, with an emphasis on providing assistance for Hydraulic Reports and permit related tasks. The Consultant's staff will support IDOT staff with reviews of in-house and Consultant lead hydraulic projects. The Consultant's staff may provide project management assistance, technical support, data review, and perform field checks to ensure project deadlines are met. Coordination with District Two, Central Office and outside agency staff may be necessary, so having good communication skills will be essential. In addition, performing general engineering services may also be required, which includes conducting route surveys, land surveys, hydraulic surveys, geometric studies, and preparing Project Reports (Categorical Exclusion projects only). This work may include data collection, development of alignment alternatives, cost estimates, ADA, traffic management analysis, crash analyses, Type, Size and Location (TS&L) drawings, structure plans, and other related work and exhibits necessary to produce the Project Report. The Prime firm must be prequalified in the following categories to be considered for this project: Highways (Roads and Streets) Hydraulic Reports (Waterways: Complex) Location Design Studies (Rehabilitation) Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The method of contractor selection has not been determined at this time. ILDOT - 33 - RFQ Engineering - Various Phase I/II Projects, Various Routes

Conceptual

Bridges / Tunnels

$500,000.00

Public - State/Provincial

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
360
Active Projects
240
Bidding Soon
2,836
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 21, 2027

Project location map

Multiple Locations, Dixon, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.