BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 8, 2026 at 8:00 PM

Updated May 15, 2026

Renovation of a military facility in Goldsboro, North Carolina. Completed plans call for the renovation of a military facility.

This requirement is for the complete turn-key installation of new electrical circuits and outlets at eight (8) Unaccompanied Military Housing (dormitory) buildings at Seymour Johnson Air Force Base (SJAFB), North Carolina. The service will provide dedicated, accessible power to the ground-floor stairwells (East and West ends) of each facility. The scope requires the contractor to furnish all labor, materials, and equipment to install sixteen (16) new 20-amp, 120-volt Ground Fault Circuit Interrupter (GFCI) circuits. These circuits will power a total of sixty-four (64) new 15-amp duplex receptacles, with four receptacles per stairwell. Key materials include approximately 2,900 linear feet of 3/4" Schedule 40 PVC conduit, over 8,600 feet of #12 THWN-THHN copper wire, GFCI-compatible weatherproof "in-use" covers, and 20-amp single-pole, bolt-on GFCI circuit breakers compatible with the existing Siemens electrical panels. All work, materials, and labeling shall conform to the most current editions of the National Electrical Code (NEC), UFC 3-501-01, and UFC 3-520-01.

Sub-Bidding

Military

$10,000,000.00

Public - Federal

Renovation

4

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
196
Active Projects
108
Bidding Soon
1,358
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 18, 2026

July 17, 2026

Project location map

Multiple Locations, Goldsboro, NC


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.