BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 10, 2026 at 8:00 PM

Updated May 15, 2026

Demolition, site work and new construction of a playground / park / athletic field in Gardner, Massachusetts. Completed plans call for the construction of a playground / park / athletic field; playground / park / athletic field; and for site work for a playground / park / athletic field.

The project includes furnishing all labor, equipment and materials required to complete the Greenwood Pool Pavilion Project. The project includes, but is not limited to, removal and disposal of existing concrete sidewalk and walkway, site grading, construction of new wood framed pavilion, concrete pad, sidewalk, plantings, wheelchair ramp, curbing, and other work, appurtenances, and incidental items as set forth in the contract documents. Combined MBE/WBE: 10.4 % of the Construction Contract Price. Question Deadline 05/30/2026 Must be received by the City not less than five (5) days prior to the date set for receipt of bids. Written inquires should be directed to: The Department of Community Development and Planning, Manca Annex, 115 Pleasant Street, Room 201, Gardner, MA 01440. Attn: Evan Cudmore, Assistant Director. The Project is the Greenwood Pool Pavilion Project, located at 69 Park Street, Gardner, Worcester County, Massachusetts.

GC Bidding

Playgrounds / Parks / Athletic Fields

$3,000,000.00

Public - City

Demolition, New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

13

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 4, 2026

July 19, 2026

Project location map

69 Park St, Gardner, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.