BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 11, 2026 at 8:00 PM

Updated May 14, 2026

Site work and paving for a road / highway in Orbisonia, Pennsylvania. Completed plans call for site work for a road / highway; and for paving for a road / highway.

This Project is the Mill and Overlay on Us 522 From Palmer Street/borough LINE to Cromwell Street in Cromwell Township and Orbisonia Borough, Huntingdon County as Indicated on the Approved Drawings Included in the Bid Package for State Route 0522, Section 016 From Approximately Segment 0220 Offset 0000 to Segment 0240 Offset 0500. Project Cost Range: $500,000.00 - $999,999.99 Federal Project Status: PENNDOT Oversight NHS Structure Work: 0.00% Pre-Bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Resurfacing/overlays Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. PADOT - US 522 - Palmer Street to Cromwell Street *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

GC Bidding

Roads / Highways

$1,000,000.00

Public - State/Provincial

Paving, Site Work

9

8

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
275
Active Projects
117
Bidding Soon
1,307
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 4, 2026

July 20, 2026

Project location map

US-522, Orbisonia, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.