Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 14, 2026 at 8:00 PM
Updated May 16, 2026
Site work and paving for a mixed-use development in Sunnyvale, California. Completed plans call for site work for a sidewalk / parking lot.
Furnishing all labor, materials, and equipment and performing all work necessary and incidental to the completion of the project known as "EVELYN AVENUE MULTI-USE TRAIL, Project No. TR-23-02" consisting of installing a Multi-Use Trail on the north side of West Evelyn Avenue from South Bernardo Avenue to Mathilda Place and connections to cross-street bike and pedestrian facilities. Multi-use trail shall include AC grinding, and AC overlay. In addition: minor concrete work, curb ramps replacement, AC pavement, slurry seal on AC pavement, drainage facilities, bioretention areas, signing and striping, adjusting utility boxes to finished grade, planting and irrigation, signal and conduit work, according to plans and specifications prepared by the City of Sunnyvale and according to the contract documents. Project is to be completed within a total maximum of two hundred sixty (260) working days. Bid(10%), Performance(100%), Payment(100%) Pre-Bid Meeting No Online Q&A Yes Q&A Deadline 05/20/2026 5:00 PM (PDT)
GC Bidding
Sidewalks / Parking Lot
$4,301,222.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 27, 2026
July 27, 2026
W Evelyn Ave, Sunnyvale, CA
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
