BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 21, 2026 at 8:00 PM

Updated May 22, 2026

Site work and paving for a road / highway in Salt Lake City, Utah. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The purpose is to enter into a contract with the lowest responsive and responsible bidder to provide services to place the granular borrow and untreated base course on the graded road. Question Deadline 05/18/2026 at 10:00 AM MT Questions Online Portal Provide, spread and compact a 6 inch layer of Granular Borrow across the rough-graded roadway. The top width of this course should be 22.67 feet wide. Provide, spread and compact a 4-inch layer of Untreated Base Course above the Granular Borrow. This will be the final roadway surface. The top width will be 20.0 feet wide. Install the Granular Borrow and Untreated Base Course materials with 2.0% cross slopes from the centerline crown with 4H:1V (25%) side slopes (see the Typical Section on Sheet 7 of Attachment E). In summary, the work will include the following items: 1. Mobilization - San Juan County (Lump Sum) 2. Granular Borrow (estimated 7,300 tons) 3. Untreated Base Course (estimated 4,200 tons) Payment will be based on quantities tracked via weigh tickets.

Bid Results

Roads / Highways

$275,400.00

Public - State/Provincial

Paving, Site Work

9

4

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
183
Active Projects
113
Bidding Soon
1,312
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 18, 2026

June 17, 2026

Project location map

Multiple Locations, Salt Lake City, UT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.