Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 4, 2026 at 8:00 PM
Updated June 5, 2026
Outdoor lighting for a sidewalk / parking lot in Orem, Utah. Completed plans call for outdoor lighting for a sidewalk / parking lot.
The work includes removing 123 existing streetlights, connecting to 91 power poles with risers, and connecting to 16 existing transformers or existing junction boxes. Work also includes the installation of 127 new junction boxes, 142 new city light poles and fixtures. Work also includes boring approximately 20,030 feet of 1 inch conduit. Question Deadline 05/28/2026 at 5:00 PM MT Online Portal The engineer's estimate for the work is between $1,450,000.00 to $1,600.000.00. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Intent to Bid Due Date: Jun 2nd 2026, 2:00 PM MDT
Bid Results
Sidewalks / Parking Lot
$683,779.00
Public - City
Outdoor Lighting
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 2, 2026
August 3, 2026
Multiple Locations, Orem, UT
Related To This Project
Orem, UT
Bid Date: May 28 2026
Orem, UT
Bid Date: Jun 02 2026
Orem, UT
Bid Date: May 06 2026
Orem, UT
Bid Date: May 07 2026
Orem, UT
Bid Date: Apr 30 2026
Orem, UT
Bid Date: Apr 30 2026
Orem, UT
Bid Date: Jun 09 2026
Orem, UT
--
Orem, UT
Bid Date: Apr 30 2026
Orem, UT
Bid Date: Apr 30 2026
Orem, UT
Bid Date: Apr 30 2026
Orem, UT
Bid Date: Apr 28 2026
Orem, UT
Bid Date: Apr 08 2026
Orem, UT
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
