Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 12, 2026 at 8:00 PM
Updated May 16, 2026
This is a service / maintenance or supply contract in Fairlawn, Virginia. Contact the soliciting agency for additional information.
Removal and replacement of existing electrical switchboards and motor control center panels within the ALTESS data center, including demolition of one GE fused switchboard and associated MCC in Room 119 and one Westinghouse fused switchboard and associated MCC in Room 241. Work includes temporary power provisions to maintain operation of hot water pumps and sewer ejection compressors during changeover; removal, rerouting, and reconnection of feeder and through circuits; installation of new customized Eaton (or equal) switchboards and MCC panels sized to support all existing loads, lighting panel feeds, and future capacity; integration and preservation of all controls, wiring, and current transformers supporting Trane Building Automation Systems and Schneider Electric StruxureWare monitoring systems; and reinstallation or relocation of hand-off-auto controls as required. All BAS-related work must be verified and recommissioned by a certified Trane Authorized Controls technician with full functional testing. The scope also includes after-hours and weekend repowering activities, certified testing of newly installed systems, arc flash, short circuit, and coordination studies for the entire facility, and proper disposal of all removed equipment and associated debris at approved facilities. Location: ALTESS Data Center, Radford Army Ammunition Plant, Radford, VA 24141-1061
Conceptual
Military
Public - Federal
Service, Maintenance and Supply
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 1, 2026
Constitution Rd, Fairlawn, VA
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
